DCI H2 Campus (H2-01, H2-02), Karawang is a data center project in Karawang, Indonesia, operated by DCI Indonesia. It is operational and expanding. It is planned for 600 MW of IT load. The operator reports 27 MW running.

Latest change on record: moved to expanding on 21 October 2021. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
600 MW
Running now
27 MW
Operators rarely publish this
Operator
DCI Indonesia
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and DCI H2 Campus (H2-01, H2-02), Karawang ranks first by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

DCI Indonesia has 3 others in Indonesia tracked by ArusGrid, including DCI H1 Campus (JK1 to JK6), Cibitung, DCI E1, Downtown Jakarta and DCI Bintan Campus (Hyperscale 3 / H3). It sits on the DCI H2 Karawang campus. Named funding comes from Anthoni Salim on the equity side and Salim Group. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. H2-01 at 15 MW is operational with a 2021 target; H2-02 (solar-powered) at 12 MW is operational with a 2023 target; H2-03 is announced. The dated record runs from under construction on 21 June 2021 to operational and expanding on 21 October 2021. Power comes from DCI Indonesia (own solar) through onsite solar.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 16 July 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

600MW-scale greenfield hyperscale campus with dedicated 30MW on-site solar PV; positioned by DCI/Salim for hyperscale and AI workloads. No disclosed cooling/rack-density spec.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

H2-01 · Operational15 MW, target 2021
H2-02 (solar-powered) · Operational12 MW, target 2023
H2-03 · AnnouncedSize not published

Stage history

2021-06-21Under construction · dci-indonesia.com
2021-10-21Expanding · market.bisnis.com

Who is behind it

OperatorDCI Indonesia · Colocation
Funder, Joint venture partnerSalim Group
Funder, EquityAnthoni Salim

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

ArusGrid estimate, building costabout US$5.7bn to US$8.5bn

No figure has been announced. This range is 600 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estatePertiwi Lestari Industrial Estate (Salim Group) · 86 ha · Jun 2023 Confirmed source ↗
Power supply
On-site solarDCI Indonesia (own solar) · 30 MW · Jun 2023 Confirmed source ↗
Solar of up to 30MW on 30ha inside the 86ha H2 campus. No grid utility is named. · Applies to the whole campus.

Sources checked 2026-10-21

  1. dci-indonesia.com
  2. datacenterdynamics.com
  3. thetechcapital.com
  4. DCII Ekspansi Data Center di 2026, Eskalasi Kapasitas Hingga 2.000 MW (EmitenNews, 2026-03-31)
  5. DCII Non-Rated (KB Valbury Sekuritas, 2026-07-16)
  6. Gandeng DCII, Grup Salim Mulai Operasikan Data Center 15 MW (Bisnis.com, 2021-10-21)
  7. PT DCI Indonesia Tbk (DCI) Announces The Construction of the Second Location Hyperscale Data Center Campus (H2) (DCI Indonesia, 2021-06-21)

More in Greater Jakarta

Also run by DCI Indonesia

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.