DCI E1, Downtown Jakarta data center

Jakarta, DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to city level

DCI E1, Downtown Jakarta is a data center project in Jakarta, Indonesia, operated by DCI Indonesia. It is operational. It is planned for 18 MW of IT load. The operator reports 18 MW running.

Latest change on record: entered the record as operational on 18 December 2023. Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
18 MW
Running now
18 MW
Operators rarely publish this
Operator
DCI Indonesia
Colocation
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and DCI E1, Downtown Jakarta ranks 29th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

DCI Indonesia has 3 others in Indonesia tracked by ArusGrid, including DCI H2 Campus (H2-01, H2-02), Karawang, DCI H1 Campus (JK1 to JK6), Cibitung and DCI Bintan Campus (Hyperscale 3 / H3). Named funding comes from Salim Group on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as operational on 18 December 2023.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 14 August 2024, and last checked the record on 18 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusUnlikely

Downtown interconnection/enterprise facility adjacent to the IIX (Cyber 1) and Open-IX (Duren Tiga) exchanges; Tier IV but interconnection-focused, not built for high-density AI.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2023-12-18Operational · dci-indonesia.com

Who is behind it

OperatorDCI Indonesia · Colocation
Funder, EquitySalim Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$172m to US$232m

No figure has been announced. This range is 18 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-18

  1. dci-indonesia.com
  2. DCI Indonesia and Salim Group, Inaugurate First Tier IV Data Center in Downtown Jakarta (DCI Indonesia, 2023-12-18)
  3. DCI Indonesia celebrates Tier IV certification milestone (BTW Media, 2024-08-14)

More in Greater Jakarta

Also run by DCI Indonesia

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.