DCI Bintan Campus (Hyperscale 3 / H3) is a data center project in Bintan, Indonesia, operated by DCI Indonesia. It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Record last checked against its sources on 21 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.
Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and DCI Bintan Campus (Hyperscale 3 / H3) has no published figure so it sits outside that ranking. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.
DCI Indonesia has 3 others in Indonesia tracked by ArusGrid, including DCI H2 Campus (H2-01, H2-02), Karawang, DCI H1 Campus (JK1 to JK6), Cibitung and DCI E1, Downtown Jakarta. It sits on the DCI Bintan campus. Named funding comes from Salim Group on the equity side and Gallant Venture. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 16 July 2026, and last checked the record on 21 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Gigawatt-scale greenfield explicitly aimed at Singapore cloud/AI spillover demand; DCI states the campus will be leased/sold to hyperscalers and cloud companies. No tenant, no cooling spec, no GPUs yet.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Platform capital spans several sites. It is never added to this project's own figure.
No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Batam and Bintan · All projects in Indonesia · All DCI Indonesia projects · All projects at the land and permitting stage · Data center rules in Indonesia · Full directory