Directory › Indonesia › Batam and Bintan › DCI Bintan Campus (Hyperscale 3 / H3)

DCI Bintan Campus (Hyperscale 3 / H3)

Bintan, Riau Islands, Indonesia · Batam and Bintan market · location approximate to city level

DCI Bintan Campus (Hyperscale 3 / H3) is a data center project in Bintan, Indonesia, operated by DCI Indonesia. It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
DCI Indonesia
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Long shot1 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and DCI Bintan Campus (Hyperscale 3 / H3) has no published figure so it sits outside that ranking. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

DCI Indonesia has 3 others in Indonesia tracked by ArusGrid, including DCI H2 Campus (H2-01, H2-02), Karawang, DCI H1 Campus (JK1 to JK6), Cibitung and DCI E1, Downtown Jakarta. It sits on the DCI Bintan campus. Named funding comes from Salim Group on the equity side and Gallant Venture. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 16 July 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Gigawatt-scale greenfield explicitly aimed at Singapore cloud/AI spillover demand; DCI states the campus will be leased/sold to hyperscalers and cloud companies. No tenant, no cooling spec, no GPUs yet.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorDCI Indonesia · Colocation
Funder, Joint venture partnerGallant Venture
Funder, EquitySalim Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Platform deals that include it

DCI Indonesia x Gallant Venture, 700ha Bintan data centre park JV
Other, 2025-10
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-21

  1. forbes.com
  2. indonesiabusinesspost.com
  3. voi.id
  4. DCI Indonesia, Tycoon Anthoni Salim's Gallant Venture Building Data Center Hub Near Singapore (Forbes, 2025-10-27)
  5. DCII Non-Rated (KB Valbury Sekuritas, 2026-07-16)
  6. DCII Ekspansi Data Center di 2026, Eskalasi Kapasitas Hingga 2.000 MW (EmitenNews, 2026-03-31)

More in Batam and Bintan

Also run by DCI Indonesia

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.