Range IDC / Equator Gate System Batam AI Data Center

Batam, Riau Islands, Indonesia · Batam and Bintan market · location approximate to district level

Also listed as PT Equator Gate System Batam.

Range IDC / Equator Gate System Batam AI Data Center is a data center project in Batam, Indonesia, operated by Equator Gate System Batam (EGSB) / Range Intelligent Computing. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Equator Gate System Batam (EGSB) / Range Intelligent Computing
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
○ Land secured✓ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and Range IDC / Equator Gate System Batam AI Data Center has no published figure so it sits outside that ranking. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

It is the only Range IDC project ArusGrid tracks. Named funding comes from Range Intelligent Computing Technology on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The money on record is US$5bn as of May 2026, the announced investment. Power comes from PLN Batam through grid supply.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 2 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Explicitly announced as an AI data centre; developer Range IDC is one of China's largest AI/IDC operators (Shenzhen-listed). PPA signed with PLN Batam for high-density AI load. No cooling spec, no GPU deployment, no tenant yet.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorEquator Gate System Batam (EGSB) / Range Intelligent Computing · Colocation
Funder, EquityRange Intelligent Computing Technology

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-05US$5bn

The figure covers the whole campus.

Platform deals that include it

Equator Gate System Batam (Range IDC), US$5bn AI campus plus PLN Batam PPA
Platform capital, 2026-05
US$5.0bn
PLN Batam x EGSB (Range) power purchase agreement
Power deal, 2026-05-25
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Grid supplyPLN Batam · May 2026 Confirmed source ↗
PJBTL signed with PT Equator Gate System Batam for EGS AI Data Center, Nongsa 30 ha, phased supply; capacity not disclosed
Water and cooling
WaterDesalinated seawater · EGSB-built SWRO plant (planning stage), management to be handed to BP Batam Reported source ↗
BP Batam requires PT Equator Gate System Batam, Teluk Mata Ikan, Nongsa, to build SWRO for cooling water

Sources checked 2026-10-21

  1. en.antaranews.com
  2. w.media
  3. bernama.com
  4. datacentermap.com
  5. Batam Set To Host US$5 Bln AI Data Centre Project (Bernama, 2026-05-25)
  6. RI Makin Diminati, Ini 8 Rencana Pembangunan Data Center Baru pada 2026 (Bisnis.com, 2026-10-02)
  7. Raksasa Data Center Cina Siap Investasi Rp88 Triliun di Batam (Bisnis.com, 2026-05-29)

More in Batam and Bintan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.