Directory › Indonesia › Batam and Bintan › Quantum AI Data Center (WorldVuer iByond)

Quantum AI Data Center (WorldVuer iByond)

Batam, Riau Islands, Indonesia · Batam and Bintan market · location approximate to city level

Quantum AI Data Center (WorldVuer iByond) is a data center project in Batam, Indonesia, operated by WorldVuer iByond. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
WorldVuer iByond
Local developer
AI workloads
No signal either way
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and Quantum AI Data Center (WorldVuer iByond) has no published figure so it sits outside that ranking. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

It is the only WorldVuer iByond project ArusGrid tracks. It sits on the Tunas Prima Industrial Estate campus. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The money on record is IDR 6.5tn (about US$400m) as of 2025, the announced investment.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 17 July 2025, and last checked the record on 18 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

Self-described 'Asia's first Quantum AI Data Center'. Marketing language only, no technical spec, no tenant, no permit evidence. Not upgraded to 'likely'.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorWorldVuer iByond · Local developer

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2025IDR 6.5tn (about US$400m)

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateTunas Prima Industrial Estate · Jul 2025 Reported source ↗
Site is within the green industrial zone of Tunas Prima in Batam. Partnership signed in Jakarta. Area and terms not disclosed.

Sources checked 2026-10-18

  1. datacentermap.com
  2. baxtel.com
  3. Batam set to host Asia's first quantum AI data center: BKPM (ANTARA, 2025-07-15)
  4. AI OS company claims it will build quantum data center in Indonesia (DCD, 2025-07-17)
  5. Worldvuer iByond to invest IDR 6 trillion in Quantum AI data centre (IDNFinancials, 2025-07-15)

More in Batam and Bintan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.