ArusGridProject
Directory › Indonesia › Batam and Bintan › AESLER-GREENIX Mark 1

AESLER-GREENIX Mark 1 data center

Batam, Riau Islands, Indonesia · Batam and Bintan market · location approximate to district level

AESLER-GREENIX Mark 1 is a data center project in Batam, Indonesia, operated by PT Aesler Grup Internasional Tbk. It has been announced and has not yet reached the land or permitting stage. It is planned for 16 MW of IT load.

Latest change on record: entered the record as announced on 28 January 2022. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
16 MW
Running now
Not disclosed
Operators rarely publish this
Operator
PT Aesler Grup Internasional Tbk
Local developer
AI workloads
No signal either way
Evidence grade
Thin
Will it get built?Long shot0 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and AESLER-GREENIX Mark 1 ranks 8th by planned capacity. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

It is the only Aesler project ArusGrid tracks. It sits on the AESLER-GREENIX campus. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Mark 1 at 16 MW is announced; Mark 2 at 16 MW is announced; Mark 3 at 56 MW is announced. The stage was recorded as announced only on 28 January 2022.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 21 December 2021, and last checked the record on 21 October 2026.

How well evidenced is it

The announcement stands alone, or the project is on hold. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Mark 1 · Announced16 MW
Mark 2 · Announced16 MW
Mark 3 · Announced56 MW

Stage history

2022-01-28Announced · w.media

Who is behind it

OperatorPT Aesler Grup Internasional Tbk · Local developer

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$152m to US$206m

No figure has been announced. This range is 16 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. w.media
  3. datacentermap.com
  4. dinsights.katadata.co.id
  5. Aesler Grup (RONY) Gandeng Huawei Bangun Data Center (Bisnis Indonesia, 2021-12-21)

More in Batam and Bintan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.