ArusGridProject
Directory › Indonesia › Batam and Bintan › Altiva Identity Datacenter Nongsa

Altiva Identity Datacenter Nongsa

Batam (Nongsa), Riau Islands, Indonesia · Batam and Bintan market · location approximate to district level

Altiva Identity Datacenter Nongsa is a data center project in Batam (Nongsa), Indonesia, operated by PT Altiva Identity Datacenter. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as announced on 28 July 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
PT Altiva Identity Datacenter
Local developer
AI workloads
No signal either way
Evidence grade
Thin
Will it get built?Long shot1 of 7 gates passed
○ Land secured✓ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and Altiva Identity Datacenter Nongsa has no published figure so it sits outside that ranking. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

It is the only Altiva project ArusGrid tracks. It sits on the Altiva Nongsa campus. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 28 July 2026. Power comes from PLN Batam through grid supply.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 29 July 2026, and last checked the record on 22 October 2026.

How well evidenced is it

The announcement stands alone, or the project is on hold. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-07-28Announced · plnbatam.com

Who is behind it

OperatorPT Altiva Identity Datacenter · Local developer

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Grid supplyPLN Batam · 690 MVA · Jul 2026 Confirmed source ↗
Power purchase agreement for 2 x 345 MVA. Supply phased from 2027. · Applies to the whole campus.

Sources checked 2026-10-22

  1. PLN Batam dan Altiva Identity Datacenter Tandatangani PJBTL 2 x 345 MVA, Perkuat Batam sebagai Pusat Ekonomi Digital (PLN Batam, 2026-07-28)
  2. Batam Siapkan Listrik dan Air demi Tarik Investasi Data Center di Tengah Tren AI (Katadata, 2026-07-29)

More in Batam and Bintan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.