ArusGridProject
Directory › Indonesia › Batam and Bintan › DayOne Nongsa Digital Park Campus (NDP1-3)

DayOne Nongsa Digital Park Campus (NDP1-3)

Batam, Riau Islands, Indonesia · Batam and Bintan market · location approximate to district level

DayOne Nongsa Digital Park Campus (NDP1-3) is a data center project in Batam, Indonesia, operated by DayOne (PT Digitalland Service One). It is operational. It is planned for 72 MW of IT load. The operator reports 72 MW running.

Latest change on record: moved to operational on 20 September 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
72 MW
Running now
72 MW
Operators rarely publish this
Operator
DayOne (PT Digitalland Service One)
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and DayOne Nongsa Digital Park Campus (NDP1-3) ranks 5th by planned capacity. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

DayOne has 1 other in Indonesia and 7 projects elsewhere in the dataset tracked by ArusGrid, including DayOne Kabil Industrial Tech Park (KITP). It sits on the Nongsa Digital Park alongside BW Digital NDP1, Golden Digital Gateway (Nongsa One), Princeton Digital Group BT1 and Pusat Data Nasional 2 (National Data Center Batam). Named funding comes from DBS and UOB as debt and Indonesia Investment Authority (INA). The named user of the compute is Oracle (reported, unconfirmed).

The build is phased. Building 1 at 17 MW is operational with a 2025 target; Building 2 at 17 MW is operational with a 2025 target; Building 3 at 38 MW is operational with a 2026 target. The dated record runs from under construction on 14 July 2022 to operational on 20 September 2026. The money on record is IDR 6.7tn (about US$411m) as of June 2025, debt raised, which ArusGrid keeps out of capital totals.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 9 public sources for this project, the latest dated 5 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Oracle's OCI 'Indonesia North (Batam)' cloud region is live and hosted here, Oracle reportedly takes entire DayOne plots. ≥100MW-class modern greenfield campus marketed for AI/cloud. No published rack density or liquid-cooling spec, so not 'confirmed'.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Building 1 · Operational17 MW, target 2025
Building 2 · Operational17 MW, target 2025
Building 3 · Operational38 MW, target 2026

Stage history

2022-07-14Under construction · dayonedc.com
2026-09-20Operational · sec.gov

Who is behind it

OperatorDayOne (PT Digitalland Service One) · Colocation
Funder, Joint venture partnerIndonesia Investment Authority (INA)
Funder, DebtDBS
Funder, DebtUOB

Who uses the compute

Tenant · hyperscalerOracle · reported, unconfirmed

Oracle Indonesia North (Batam) cloud region, leased from DayOne at Nongsa Digital Park · as of 2025-07-11

DCD, citing Bloomberg, says Oracle will lease data centers operated by DayOne at Nongsa Digital Park, Batam, for its Indonesia North (Batam) region; Fintech News Indonesia (14 Jul 2025) says the region is listed live on Oracle's site. Oracle itself has not named the host; MW undisclosed.

Source · Oracle establishes cloud presence in Indonesia (DCD, 2025-07-11)

Source · Oracle Launches Cloud Region in Indonesia's Batam Island (Fintech News Indonesia, 2025-07-14)

Money at this site

Debt raised, 2025-06IDR 6.7tn (about US$411m)

This is the size of a loan. ArusGrid excludes it from capital spending totals.

The figure covers the whole campus.

Platform deals that include it

DBS + UOB IDR 6.7tn (US$411m) loan to DayOne-INA JV
Debt, 2025-06
US$411m
Oracle OCI 'Indonesia North (Batam)' cloud region, lease at DayOne NDP
Anchor lease, 2025-07
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateNongsa Digital Park (Citramas Group) · 10 ha · Oct 2022 Reported source ↗
10 ha site for the first 28MW campus, built by GDS International before its rebrand to DayOne.

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. dbs.com
  3. jakartaglobe.id
  4. baxtel.com
  5. dayonedc.com
  6. DayOne Data Centers Ltd Form F-1 (US SEC, 2026-10-05)
  7. DayOne Data Centers Indonesia Data Center Officially Begins Construction (DayOne, 2022-07-14)
  8. DBS and UOB arrange record IDR 6.7 trillion (SGD 530 million) loan for data centre development project by DayOne (UOB, 2025-06-05)
  9. DayOne Signs Indonesia's Largest 511MVA (450MW) PPA to Expand Hyperscale Data Center Platform in Batam (DayOne, 2026-04-17)

Same campus, Nongsa Digital Park

More in Batam and Bintan

Also run by DayOne

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.