DayOne Kabil Industrial Tech Park (KITP)

Batam, Riau Islands, Indonesia · Batam and Bintan market · location approximate to district level

Also listed as DayOne Kabil Industrial Tech Park and Kabil Industrial Tech Park.

DayOne Kabil Industrial Tech Park (KITP) is a data center project in Batam, Indonesia, operated by DayOne (PT Digitalland Service One). It is under construction. It is planned for 360 MW of IT load.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
360 MW
Running now
Not disclosed
Operators rarely publish this
Operator
DayOne (PT Digitalland Service One)
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed✓ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Batam and Bintan holds 12 active projects with 835 MW of planned IT load between them, and DayOne Kabil Industrial Tech Park (KITP) ranks first by planned capacity. Of those, 2 are operational, 4 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Batam and Bintan, and ArusGrid does not estimate one.

DayOne has 1 other in Indonesia and 7 projects elsewhere in the dataset tracked by ArusGrid, including DayOne Nongsa Digital Park Campus (NDP1-3). It sits on the Kabil Industrial Tech Park. The named user of the compute is Firmus (confirmed).

Power comes from PLN Batam through a green tariff.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 11 public sources for this project, the latest dated 5 October 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

Firmus to deploy a 170,000-GPU cluster here (Grace Blackwell / Vera Rubin / Vera AI), rolling out through 2027-2028 under an Nvidia agreement running to 2034 (DCD, 29 Jun 2026).

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorDayOne (PT Digitalland Service One) · Colocation

Who uses the compute

Tenant · GPU cloudFirmus · confirmed

360 MW · Full 360MW campus, up to 170,000 Nvidia accelerators, co-developed with DayOne · as of 2026-06-29

Firmus's own release says it will build a 360MW, 170,000-GPU AI factory campus in Batam with DayOne; DCD places it at Kabil Tech Park under the 450MW PLN PPA. No Firmus customer is named for Batam. Meta signed to lease Firmus Southeast Asia capacity (DCD, 29 Sep 2026) without a site named, held as a lead.

Source · Firmus to Build 170,000 GPU AI Factory Campus with NVIDIA for Global AI-Natives (Firmus Technologies, 2026-06-29)

Source · Firmus to deploy 170,000 GPU cluster in Batam, Indonesia (DCD, 2026-06-29)

Money at this site

ArusGrid estimate, building costabout US$3.4bn to US$5.1bn

No figure has been announced. This range is 360 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

DayOne / PLN Batam 511 MVA (~450MW) power purchase agreement
Power deal, 2026-04
Not disclosed
Firmus x Nvidia 170,000-GPU deployment at DayOne Batam
Anchor lease, 2026-06
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated byKabil Industrial Tech Park (BP Batam allocation) · Apr 2026 Reported source ↗
Power supply
Green tariffPLN Batam · Aug 2026 Confirmed source ↗
Ground-mounted or floating solar plus BESS, capacity not stated · Head of Agreement with PT Digitalland Services One (DayOne) for green energy; covers DayOne Batam, site not specified (also NDP) · Covers the operator's wider portfolio in this country, not this site alone.
Grid supplyPLN Batam · 511 MVA · Apr 2026 Confirmed source ↗
Supply agreement with BP Batam as third party; delivered in phases 2026 to 2027 · Applies to the whole campus.
Power allocation or planPLN Batam · 200 MW · Apr 2026 Reported source ↗
MoU for a solar plant of more than 200 MWp, described as one of the largest in Indonesia and Southeast Asia. · Signed with the 511 MVA PJBTL at BP Batam. The PJBTL power is supplied in phases over 2026 to 2027. The solar plant is an MoU only. · Applies to the whole campus.
Water and cooling
WaterDesalinated seawater · DayOne-built plant, handed to BP Batam Reported source ↗
BP Batam made the desalination plant a condition of approval because of island water stress

Sources checked 2026-10-22

  1. thejakartapost.com
  2. datacenterdynamics.com
  3. w.media
  4. dayonedc.com
  5. Firmus to deploy 170,000 GPU cluster in Batam, Indonesia (DCD, 2026-06-29)
  6. DayOne Data Centers Ltd Form F-1 (US SEC, 2026-10-05)
  7. Firmus, Nvidia to build first AI data center campus in Indonesia (Indonesia Business Post, 2026-06-29)
  8. Australian start-up Firmus to build Nvidia-powered data center on Batam (The Jakarta Post, 2026-06-29)
  9. DayOne Signs Indonesia's Largest 511MVA (~450MW) PPA to Expand Hyperscale Data Center Platform in Batam (DayOne, 2026-04-17)
  10. RI Makin Diminati, Ini 8 Rencana Pembangunan Data Center Baru pada 2026 (Bisnis.com, 2026-10-02)
  11. Proyek Data Center di Batam Raksasa Resmi Bergulir, Bidik Jadi Hub Digital Asia (Bisnis Indonesia, 2026-04-17)

More in Batam and Bintan

Also run by DayOne

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.