ArusGridProject
Directory › Malaysia › Johor › Digital Halo JHB1

Digital Halo JHB1 data center

Iskandar Puteri (Gelang Patah), Johor, Malaysia · Johor market · location approximate to district level

Also listed as Digital Halo data center Malaysia and Halo data center Johor.

Digital Halo JHB1 is a data center project in Iskandar Puteri (Gelang Patah), Malaysia, operated by Digital Halo (Partners Group). It is under construction. It is planned for 120 MW of IT load.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
120 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Digital Halo (Partners Group)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Digital Halo JHB1 ranks 17th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Digital Halo has 1 project elsewhere in the dataset tracked by ArusGrid, including Digital Halo MNL1. It sits on the Digital Halo JHB1 (Nusa Cemerlang) campus. Named funding comes from Partners Group on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The money on record is RM115.87m (about US$25m) as of June 2024, the announced investment. Power comes from Tenaga Nasional Berhad (TNB) through grid supply (reported, unconfirmed).

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 14 May 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

no cooling/density/tenant signal published 120MW modern greenfield hyperscale campus under construction (size rule).

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (fully leased, single client) · Under construction20 MW, target 2026

Who is behind it

OperatorDigital Halo (Partners Group) · Colocation
Funder, EquityPartners Group

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2024-06RM115.87m (about US$25m)

The figure covers land only.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerCrescendo Corp Bhd (Panoramic Industrial Development Sdn Bhd) · 20.463 acres · RM115.88m (≈US$26m) · freehold · Jun 2024 Confirmed source ↗
Buyer Digital Halo Pte Ltd; Pulai (Nusa Cemerlang area); RM130 psf; completed Apr 2025
Power supply
Grid supplyTenaga Nasional Berhad (TNB) · 150 MW · Sep 2025 Reported source ↗
ESA via TNB Green Lane Pathway
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedWest River Bhd · Grid and substation works · RM22.56m (≈US$5m) · Aug 2026 source ↗
This project is one of 2 that fit. The other is Digital Hyperspace Johor.

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. w.media
  3. w.media
  4. Digital Halo tops out Johor data center, Malaysia (DatacenterDynamics, 2026-05-14)

More in Johor

Also run by Digital Halo

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.