Directory › Malaysia › Johor › K2 JHR1 Campus

K2 JHR1 Campus

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

K2 JHR1 Campus is a data center project in Sedenak (Kulai), Malaysia, operated by K2 Strategic (Kuok Group). It is operational and expanding. The published capacity figure is 84 MW, and its basis is not stated as IT load. The operator reports 40 MW running.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
84 MW
unstated
Running now
40 MW
Operators rarely publish this
Operator
K2 Strategic (Kuok Group)
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and K2 JHR1 Campus ranks 22th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

K2 (Kuok) has 2 projects elsewhere in the dataset tracked by ArusGrid, including K2 Data Centres BKK31-32, Rayong and K2 Data Centres JKT01, Cikarang. It sits on the K2 Sedenak Tech Park. Named funding comes from Kuok Group on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 (opened Oct 2024) at 40 MW is operational with a 2024 target; JHR01-03 balance at 20 MW is announced; JHR04 (Phase 4) at 24 MW is under construction with a 2026 target. Power comes from TNB through grid supply at 275 kV. Cooling uses hybrid air and liquid cooling.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 24 July 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

234MW modern greenfield (2023+)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (opened Oct 2024) · Operational40 MW, target 2024
JHR01-03 balance · Announced20 MW
JHR04 (Phase 4) · Under construction24 MW, target 2026

Who is behind it

OperatorK2 Strategic (Kuok Group) · Colocation
Funder, EquityKuok Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Core and shell builderSunway Construction · RM192.88m (≈US$43m) · Oct 2023 Confirmed source ↗
Build contract, letter of initial appointment
Core and shell builderSunway Construction · RM132.7m (≈US$30m) · Feb 2025 Confirmed source ↗
Stages 1 and 2
Core and shell builderSunway Construction · RM260m (≈US$59m) · May 2025 Confirmed source ↗
Stage 3, final phase
Land
Industrial estateSedenak Tech Park (JCorp / TPM Technopark) · 60 acres Reported source ↗
K2 building on a 60-acre parcel in Sedenak Tech Park; seller/terms not stated
Power supply
Grid supplyTNB · 300 MW · 275kV · Apr 2024 Confirmed source ↗
Electricity Supply Agreement; 300MW is gross grid capacity; 275kV interim supply · Applies to the whole campus.
Water and cooling
CoolingHybrid air and liquid cooling · design PUE <1.38x Confirmed source ↗
JHR04 building: air and liquid hybrid cooling (JHR01-03 are direct air)
CoolingAir cooled · design PUE 1.4 Confirmed source ↗
Direct air cooled

Sources checked 2026-10-21

  1. k2strategic.co
  2. w.media
  3. dcbyte.com
  4. JHR01-03 Kulai, Johor (K2 Strategic)
  5. JHR04 Kulai, Johor (K2 Strategic)
  6. K2 STRATEGIC INFRASTRUCTURE MALAYSIA SDN BHD @ SEDENAK - K2 DATA CENTRE (PHASE 4) (myBina (BCI), 2026-03-30)
  7. Loan facility and revolving credit facility of up to an aggregate amount of US$140 million granted by group of onshore and offshore lenders to K2 Strategic Infrastructure Malaysia Sdn. Bhd. (Rahmat Lim & Partners, 2026-07-24)

More in Johor

Also run by K2 (Kuok)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.