Bridge Data Centres MY06

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

Bridge Data Centres MY06 is a data center project in Sedenak (Kulai), Malaysia, operated by Bridge Data Centres (Chindata/Bain). It is operational. It is planned for 110 MW of IT load.

Latest change on record: moved to operational on 20 October 2022. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
110 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Bridge Data Centres (Chindata/Bain)
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Bridge Data Centres MY06 ranks 19th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Bridge Data Centres has 5 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres MY07, Bridge Data Centres MY01/MY02 and Bridge Data Centres MY03. It sits on the BDC MY06 (Kidex Sedenak) campus. Named funding comes from Bain Capital on the equity side. The named user of the compute is ByteDance (confirmed).

The dated record runs from under construction in November 2021 to operational on 20 October 2022. The money on record is RM2.5bn (about US$595m) as of December 2021, the announced investment. Power comes from Tenaga Nasional Berhad (TNB) through a dedicated substation at 275 kV. Cooling uses evaporative cooling.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 19 December 2022, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

ByteDance confirmed anchor tenant

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (Bldg 1 of 3) · OperationalSize not published, target 2022

Stage history

2021-11Under construction · theiskandarian.com
2022-10-20Operational · datacenterdynamics.com

Who is behind it

OperatorBridge Data Centres (Chindata/Bain) · Colocation
Funder, EquityBain Capital

Who uses the compute

Tenant · hyperscalerByteDance · confirmed

110 MW · Anchor, all three buildings (19 + 42 + 45 MW phases per Dgtl Infra) · as of 2022-10-21

Bridge Data Centres' own release on the MY06 phase 1 opening quotes ByteDance's Director of Public Policy SEA, Teresa Tan, who said 'ByteDance will be the anchor tenant for BDC's hyperscale data centre'. Tenant's own statement at the named building, Sedenak Tech Park, 110MW.

Source · Bridge Data Centes and Bytedance Celebrate Grand Opening of the First Phase Hyperscale Data Centre (MY06) in Johor, Malaysia (Bridge Data Centres, 2022-10-21)

Source · TikTok owner ByteDance to expand Malaysia data center footprint in $2.1bn AI deal (DCD, 2024-06-10)

Money at this site

Announced investment, 2021-12RM2.5bn (about US$595m)

The figure covers the whole campus.

Platform deals that include it

ByteDance Malaysia cumulative commitment
Country programme, 2026-01
US$6.6bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateKidex Sedenak, Sedenak Technology Valley (estate; operator not named) · 40 acres · Dec 2021 Confirmed source ↗
Approximately 40 acres within Kidex Sedenak
Power supply
Dedicated substationTenaga Nasional Berhad (TNB) · 275kV · Oct 2022 Confirmed source ↗
PMU Sedenak 275/132kV (RM68m, done Aug 2019; RM1.2m upgrade Sep 2022); names Bridge Data Center as customer; shared area substation · Applies to the whole campus.
Water and cooling
WaterRainwater harvesting Confirmed source ↗
Rainwater harvesting saves ~1,340 m3/yr; main supply not stated (The Star 2026-07-23 says Sedenak site uses freshwater)
CoolingEvaporative cooling Confirmed source ↗
Campus uses cooling towers; drainage optimisation cut cooling tower water use ~16,000 m3 in 2025 (facility-stated)
CoolingDirect liquid cooling · design PUE 1.1 Reported source ↗
Phase 1 direct-to-chip liquid cooling; Phase 2 immersion cooling
CoolingHybrid air and liquid cooling · design PUE <1.2 Confirmed source ↗
Phase 1 uses cold-plate liquid cooling; phase 2 to use immersion; indirect evaporative cooling also used.
CoolingImmersion cooling Reported source ↗
Phase 2 uses immersion cooling. Phase 1 uses direct-to-chip liquid cooling.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTenaga Nasional Berhad (TNB) · Grid supply · Mar 2024 source ↗
This project is one of 2 that fit. The other is Bridge Data Centres MY07.

Sources checked 2026-10-21

  1. mida.gov.my
  2. datacentermap.com
  3. Bridge Data Centres launches new facility in Johor, Malaysia (DCD, 2022-10-20)
  4. Building a modular hyperscale data center in Malaysia (DCD, 2022-12-19)
  5. The First Phase Hyperscale Data Centre in Johor Malaysia Commenced (The Iskandarian, 2022-11-09)
  6. How Bridge's MY06 is Rewriting the Rules of Data Centre Construction (W.Media, 2022-11-21)

More in Johor

Also run by Bridge Data Centres

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.