ArusGridProject
Directory › Thailand › Bangkok metro › Bridge Data Centres BKK01 (ex-WHA Bangkok DC)

Bridge Data Centres BKK01 (ex-WHA Bangkok DC)

Samut Prakan, Thailand · Bangkok metro market · location approximate to city level

Bridge Data Centres BKK01 (ex-WHA Bangkok DC) is a data center project in Samut Prakan, Thailand, operated by Bridge Data Centres. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one. The operator reports 0.45 MW running.

Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
0.45 MW
Operators rarely publish this
Operator
Bridge Data Centres
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and Bridge Data Centres BKK01 (ex-WHA Bangkok DC) has no published figure so it sits outside that ranking. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Bridge Data Centres has 1 other in Thailand and 6 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres Chonburi Hyperscale Campus. Named funding comes from Bain Capital on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 24 August 2022, and last checked the record on 18 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorBridge Data Centres · Colocation
Funder, EquityBain Capital

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerWHA Mega Logistic Centers · Aug 2022 Reported source ↗
Bridge acquired the WHA Mega Logistic Centers data center in Samut Prakan. Floor area about 6,500 sqm. Price and tenure not stated.

Sources checked 2026-10-18

  1. baxtel.com
  2. datacenterdynamics.com
  3. Bridge Data Centres Acquires WHA Mega Logistic Centers' Data Center in Thailand (W.Media, 2022-08-24)

More in Bangkok metro

Also run by Bridge Data Centres

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.