Datasection Bangkok AI Data Center is a data center project in Bangkok, Thailand, operated by Datasection Inc. It is being commissioned. It is planned for 10 MW of IT load.
Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and Datasection Bangkok AI Data Center ranks 16th by planned capacity. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
It is the only Datasection project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 8 July 2026, and last checked the record on 19 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Confirmed GPU deployment: 4,696 Nvidia B200 GPUs (587 servers) purchased from ASRock Rack for ~US$257.4m, to be installed in this Bangkok facility with phased operations from Jul-Aug 2026 (Datasection disclosure, 4 Jun 2026; DCD 5 Jun 2026).
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
10 MW · 4,696 Nvidia B200 GPUs (587 servers), US$257.4m contract, phased start July and August 2026 · as of 2026-06-05
DCD reports Datasection's TSE disclosure of a US$257.4m contract to supply 4,696 B200 GPUs from a 10MW Bangkok data center to an unnamed US-based technology company, funded partly by advance customer payments. The operator of the building is not named in the report. ArusGrid has this as confirmed, which is right if it rests on the TSE filing itself; this press source is reported.
Source · Japan's Datasection to deploy 4,696 B200 GPUs in Thailand (DCD, 2026-06-05)
Platform capital spans several sites. It is never added to this project's own figure.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Bangkok metro · All projects in Thailand · All projects being commissioned · Data center rules in Thailand · Full directory