ArusGridProject
Directory › Thailand › Bangkok metro › AIS Cloud (Oracle Alloy) data centres

AIS Cloud (Oracle Alloy) data centres

Bangkok metro (2 sites, undisclosed), Bangkok, Thailand · Bangkok metro market · location approximate to city level

AIS Cloud (Oracle Alloy) data centres is a data center project in Bangkok metro (2 sites, undisclosed), Thailand, operated by Advanced Info Service (AIS Business). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to operational in June 2025. Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Advanced Info Service (AIS Business)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and AIS Cloud (Oracle Alloy) data centres has no published figure so it sits outside that ranking. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only AIS project ArusGrid tracks. Named funding comes from Advanced Info Service (AIS) on the equity side. The named user of the compute is Oracle (confirmed).

The dated record runs from announced only on 1 August 2024 to operational in June 2025. The money on record is THB 4bn (about US$115m) as of August 2024, the announced investment.

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 28 June 2025, and last checked the record on 18 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Oracle Alloy deployment giving access to 100+ OCI services including AI capabilities; launched Jun 2025 as an AI-ready sovereign hyperscale cloud.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2024-08-01Announced · khaosodenglish.com
2025-06Operational · developingtelecoms.com

Who is behind it

OperatorAdvanced Info Service (AIS Business) · Telco
Funder, EquityAdvanced Info Service (AIS)

Who uses the compute

Tenant · hyperscalerOracle · confirmed

Money at this site

Announced investment, 2024-08THB 4bn (about US$115m)

The figure covers several facilities.

It includes GPUs and IT hardware, so it is not comparable with building cost.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-18

  1. oracle.com
  2. datacenterdynamics.com
  3. ais.th
  4. AIS เปิดตัวคลาวด์ไทย มาตรฐานโลก พร้อมลุยยุค AI (Mitihoon, 2025-06-28)
  5. AIS Partners with Oracle for Thailand's First Local Hyperscale Cloud (Khaosod English (sponsored), 2024-08-01)
  6. AIS launches hyperscale cloud service for local AI workloads (Developing Telecoms, 2025-06-27)

More in Bangkok metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.