AIS Cloud (Oracle Alloy) data centres is a data center project in Bangkok metro (2 sites, undisclosed), Thailand, operated by Advanced Info Service (AIS Business). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: moved to operational in June 2025. Record last checked against its sources on 18 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and AIS Cloud (Oracle Alloy) data centres has no published figure so it sits outside that ranking. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
It is the only AIS project ArusGrid tracks. Named funding comes from Advanced Info Service (AIS) on the equity side. The named user of the compute is Oracle (confirmed).
The dated record runs from announced only on 1 August 2024 to operational in June 2025. The money on record is THB 4bn (about US$115m) as of August 2024, the announced investment.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 28 June 2025, and last checked the record on 18 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Oracle Alloy deployment giving access to 100+ OCI services including AI capabilities; launched Jun 2025 as an AI-ready sovereign hyperscale cloud.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
The figure covers several facilities.
It includes GPUs and IT hardware, so it is not comparable with building cost.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.