True IDC Data Center 7 (North Bangkok) is a data center project in Northern Bangkok, Thailand, operated by True Internet Data Center (True IDC). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as under construction on 19 June 2026. Record last checked against its sources on 20 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and True IDC Data Center 7 (North Bangkok) has no published figure so it sits outside that ranking. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
True IDC has 3 others in Thailand tracked by ArusGrid, including True IDC EEC AI Hyperscale Campus, True IDC North Muangthong and True IDC East Bangna Campus. Named funding comes from Charoen Pokphand Group and True Corporation on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as under construction on 19 June 2026. The money on record is THB 6bn (about US$180m) as of June 2026, the announced investment. Cooling uses hybrid air and liquid cooling.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 31 July 2026, and last checked the record on 20 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
True IDC describes it as its 'seventh AI hyperscale data center' (company PR, Jun 2026). Operator-stated AI purpose; no cooling/rack-density or tenant detail yet.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Bangkok metro · All projects in Thailand · All True IDC projects · All projects under construction · Data center rules in Thailand · Full directory