True IDC North Muangthong is a data center project in Pak Kret, Thailand, operated by True Internet Data Center (True IDC). It is operational and expanding. It is planned for 40 MW of IT load.
Latest change on record: entered the record as expanding in February 2024. Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and True IDC North Muangthong ranks 6th by planned capacity. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
True IDC has 3 others in Thailand tracked by ArusGrid, including True IDC EEC AI Hyperscale Campus, True IDC Data Center 7 (North Bangkok) and True IDC East Bangna Campus. It sits on the True IDC North Muangthong campus. Named funding comes from Charoen Pokphand Group and Global Infrastructure Partners on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as operational and expanding in February 2024. Cooling uses hybrid air and liquid cooling.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 26 June 2026, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
Platform capital spans several sites. It is never added to this project's own figure.
operator's own promotion page, one full rack with a 3 kW dual-source allowance, electricity included, excluding 7 percent VAT, a closing price on the last ten units Electricity included. As of 2025-01. True Internet Data Center (trueidc.com, operator's own domain), 2025-01-01
About THB 12,900 (USD 385 at the ECB rate of 33.595 for 31 January 2025) per kW of allowance. A retail rack price, never comparable with a wholesale figure. Valid to 30 June 2025 or until the units sold, so a floor to the list rate.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.