ArusGridProject
Directory › Thailand › Bangkok metro › Etix Bangkok Campus (BKK#1 + BKK#2)

Etix Bangkok Campus (BKK#1 + BKK#2)

Bangkok, Thailand · Bangkok metro market · location approximate to city level

Etix Bangkok Campus (BKK#1 + BKK#2) is a data center project in Bangkok, Thailand, operated by Etix Everywhere. It is operational and expanding. It is planned for 28 MW of IT load. The operator reports 5 MW running.

Latest change on record: entered the record as expanding on 5 August 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
28 MW
Running now
5 MW
Operators rarely publish this
Operator
Etix Everywhere
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and Etix Bangkok Campus (BKK#1 + BKK#2) ranks 7th by planned capacity. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only Etix Everywhere project ArusGrid tracks. It sits on the Etix Bangkok campus. Named funding comes from Etix Everywhere on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Etix BKK#1 at 5 MW is operational with a 2022 target; Etix BKK#2 at 23 MW is commissioning with a 2025 target. The stage was recorded as operational and expanding on 5 August 2025. The money on record is €220m (about US$257m) as of August 2025, the announced investment. Cooling uses hybrid air and liquid cooling, with a design PUE of 1.4.

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 18 June 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

Dated source (iTnews Asia / DCD, 18 Aug 2025): campus supports up to 150 kW per rack and offers air, liquid AND immersion cooling; explicitly marketed as AI-native-ready. Meets the >40kW-rack and liquid-cooling test.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Etix BKK#1 · Operational5 MW, target 2022
Etix BKK#2 · Commissioning23 MW, target 2025

Stage history

2025-08-05Expanding · dcmag.fr

Who is behind it

OperatorEtix Everywhere · Colocation
Funder, EquityEtix Everywhere

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2025-08€220m (about US$257m)

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Water and cooling
CoolingHybrid air and liquid cooling · design PUE 1.4 Reported source ↗
Air, liquid and immersion cooling offered.

Sources checked 2026-10-21

  1. itnews.asia
  2. datacenterdynamics.com
  3. w.media
  4. ETIX Everywhere ลงทุนเปิดตัวศูนย์ดาต้าเซ็นเตอร์แห่งใหม่ “ETIX BKK#2” ย้ำไทยมีศักยภาพแซงอินโดนีเซีย (Brand Inside, 2025-08-15)
  5. ETIX Everywhere announces acquisition of Thailand's Genesis Data Centre (Marketech APAC, 2022-01-28)
  6. ETIX Everywhere increases the size of its Data Center campus in Bangkok to reach 28 MW AI Ready capacity with the official launch of Bkk 2 (ETIX Everywhere (press release via DCmag), 2025-08-05)
  7. ETIX รับเงินกู้ 2.27 พันล้าน ขยายดาต้าเซ็นเตอร์ AI รับไทยฮับอาเซียน (Thansettakij, 2026-06-18)

More in Bangkok metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.