Evolution TH02 Bangkok is a data center project in Phraeksa, Mueang Samut Prakan, Thailand, operated by Evolution Data Centres. It has been announced and has not yet reached the land or permitting stage. It is planned for 200 MW of IT load.
Latest change on record: entered the record as announced on 7 April 2026. Record last checked against its sources on 21 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
Bangkok metro holds 23 active projects with 893 MW of planned IT load between them, and Evolution TH02 Bangkok ranks first by planned capacity. Of those, 6 are operational, 3 are operational and expanding, 5 are under construction, 2 are being commissioned, 3 are at the land and permitting stage and 4 are announced only. Published colocation vacancy in Bangkok metro was 22.1% as of June 2026, on 113 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Evolution DC has 1 other in Thailand and 2 projects elsewhere in the dataset tracked by ArusGrid, including Evolution DC / Central Pattana Bangkok. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 7 April 2026.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 7 September 2026, and last checked the record on 21 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
200MW modern greenfield with air and liquid cooled options stated on the operator's page
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Bangkok metro · All projects in Thailand · All Evolution DC projects · All projects announced only · Data center rules in Thailand · Full directory