Equinix JH1 + JH2 is a data center project in Iskandar Puteri, Malaysia, operated by Equinix. It is operational and expanding. It is planned for 13 MW of IT load. The operator reports 6 MW running.
Record last checked against its sources on 18 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Equinix JH1 + JH2 ranks 28th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Equinix has 1 other in Malaysia and 10 projects elsewhere in the dataset tracked by ArusGrid, including Equinix KL2. It sits on the Equinix Johor (Nusajaya Tech Park). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The build is phased. JH1 at 6 MW is operational with a 2024 target; JH2 (1,100 racks) at 7 MW is under construction with a 2027 target. The money on record is US$241m as of November 2025, the announced investment. Cooling uses direct liquid cooling.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 27 May 2024, and last checked the record on 18 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
JH2 liquid-cooled build
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
The figure covers the whole campus.
No colocation price applies to this product (retail interconnection, no colocation price applies).