Indosat / Nvidia AI Factory, Solo Technopark

Surakarta (Solo), Central Java, Indonesia · Other Indonesia market · location approximate to district level

Indosat / Nvidia AI Factory, Solo Technopark is a data center project in Surakarta (Solo), Indonesia, operated by Indosat Ooredoo Hutchison. It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Indosat Ooredoo Hutchison
Telco
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Other Indonesia holds 3 active projects with 200 MW of planned IT load between them, and Indosat / Nvidia AI Factory, Solo Technopark has no published figure so it sits outside that ranking. Of those, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Other Indonesia, and ArusGrid does not estimate one.

It is the only Indosat project ArusGrid tracks. Named funding comes from Indosat Ooredoo Hutchison on the equity side. The named user of the compute is Government of Indonesia (sovereign AI program) (reported, unconfirmed).

The money on record is US$200m as of April 2024, the announced investment.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 15 November 2024, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Stated AI purpose (Indosat x Nvidia 'AI Nation' / Indonesia AI Centre of Excellence). NOTE: the Blackwell/GB200 NVL72 deployment belongs to Lintasarta (an Indosat company nicknamed 'the AI Factory'), NOT to this Solo building, no dated source places GPUs on this site.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorIndosat Ooredoo Hutchison · Telco
Funder, EquityIndosat Ooredoo Hutchison

Who uses the compute

Tenant · governmentGovernment of Indonesia (sovereign AI program) · reported, unconfirmed

Checked on 2026-10-01. No document names a confirmed user beyond the rows above.

Money at this site

Announced investment, 2024-04US$200m

The figure covers several facilities.

It includes GPUs and IT hardware, so it is not comparable with building cost.

Platform deals that include it

Indosat / Nvidia US$200M AI centre, Surakarta
Platform capital, 2024-04
US$200m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated bySolo City Government (Pemkot Surakarta) · 8,000 sqm · Aug 2024 Reported source ↗
City-owned land inside Solo Technopark, Jebres. The city provided about 8,000 sqm for the AI centre building. The lease or transfer terms were not stated. In August 2024 the city research agency said the plan was still at the study stage.

Sources checked 2026-10-21

  1. blogs.nvidia.com
  2. siliconangle.com
  3. coingeek.com
  4. teknologi.bisnis.com
  5. Indosat dan Rencana Bangun Pusat AI di Solo hingga Papua (Fortune Indonesia, 2024-11-15)
  6. Bangun Gedung Pusat AI, Pemkot Solo Sediakan Lahan 8.000 Meter Persegi (Merahputih.com, 2024-08-10)

More in Other Indonesia

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.