Pusat Data Nasional 3 (IKN / East Kalimantan) is a data center project in Nusantara (IKN), Indonesia, operated by Kementerian Komunikasi dan Digital (Komdigi). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Record last checked against its sources on 18 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.
Other Indonesia holds 3 active projects with 200 MW of planned IT load between them, and Pusat Data Nasional 3 (IKN / East Kalimantan) has no published figure so it sits outside that ranking. Of those, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Other Indonesia, and ArusGrid does not estimate one.
Komdigi has 1 other in Indonesia tracked by ArusGrid, including Pusat Data Nasional 1 (PDN Cikarang). The named user of the compute is Government of Indonesia (confirmed).
Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 29 October 2025, and last checked the record on 18 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Other Indonesia · All projects in Indonesia · All Komdigi projects · All projects at the land and permitting stage · Data center rules in Indonesia · Full directory