Pusat Data Nasional 3 (IKN / East Kalimantan) data center

Nusantara (IKN), East Kalimantan, Indonesia · Other Indonesia market · location approximate to city level

Pusat Data Nasional 3 (IKN / East Kalimantan) is a data center project in Nusantara (IKN), Indonesia, operated by Kementerian Komunikasi dan Digital (Komdigi). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Kementerian Komunikasi dan Digital (Komdigi)
Local developer
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Other Indonesia holds 3 active projects with 200 MW of planned IT load between them, and Pusat Data Nasional 3 (IKN / East Kalimantan) has no published figure so it sits outside that ranking. Of those, 2 are at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Other Indonesia, and ArusGrid does not estimate one.

Komdigi has 1 other in Indonesia tracked by ArusGrid, including Pusat Data Nasional 1 (PDN Cikarang). The named user of the compute is Government of Indonesia (confirmed).

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 29 October 2025, and last checked the record on 18 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorKementerian Komunikasi dan Digital (Komdigi) · Local developer

Who uses the compute

Tenant · governmentGovernment of Indonesia · confirmed

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated byOtorita IKN · Sep 2024 Reported source ↗
Land in IKN being prepared by the IKN Authority as of September 2024. Site not yet fixed then.

Sources checked 2026-10-18

  1. baxtel.com
  2. iknpos.id
  3. nasional.kontan.co.id
  4. id.wikipedia.org
  5. Rencana Komdigi 2025-2029: PDN Bertambah jadi 3, Implementasi SPBE 100% (Bisnis, 2025-10-27)
  6. Meleset, Komdigi Target 3 PDN di Akhir Pemerintahan Prabowo (detikInet, 2025-10-29)
  7. Jokowi Bangun PDN di Cikarang, Batam & IKN Pakai Pinjaman Luar Negeri (Bisnis.com, 2024-09-23)

More in Other Indonesia

Also run by Komdigi

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.