Pusat Data Nasional 1 (PDN Cikarang) data center

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

Pusat Data Nasional 1 (PDN Cikarang) is a data center project in Cikarang, Bekasi, Indonesia, operated by Kementerian Komunikasi dan Digital (Komdigi). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Kementerian Komunikasi dan Digital (Komdigi)
Local developer
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Pusat Data Nasional 1 (PDN Cikarang) has no published figure so it sits outside that ranking. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Komdigi has 1 other in Indonesia tracked by ArusGrid, including Pusat Data Nasional 3 (IKN / East Kalimantan). Named funding comes from Government of Indonesia (APBN) on the equity side and French government loan + commercial banks as debt. The named user of the compute is Government of Indonesia (ministries/agencies) (confirmed).

Power comes from PLN through a dedicated substation at 150 kV (reported, unconfirmed).

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 27 January 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusUnlikely

Sovereign government cloud; published spec is CPU/storage-centric (25,000+ CPU cores, 200TB memory, 40PB storage) with no GPU, liquid-cooling or high-density disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorKementerian Komunikasi dan Digital (Komdigi) · Local developer
Funder, EquityGovernment of Indonesia (APBN)
Funder, DebtFrench government loan + commercial banks

Who uses the compute

Tenant · governmentGovernment of Indonesia (ministries/agencies) · confirmed

Limited operation for low-risk government services since Jan 2026; full migration phased over 6 to 12 months · as of 2026-01-26

Minister Meutya Hafid said PDN 1 is operating in a limited capacity for low-risk services after BSSN feasibility and security testing from July to December 2025; Bisnis adds that remaining BSSN recommendations will be met over six to twelve months before wider ministry onboarding. No individual ministry named.

Source · Kemkomdigi operasikan Pusat Data Nasional 1 secara terbatas (ANTARA, 2026-01-26)

Source · Komdigi Ungkap PDN I Mulai Beroperasi Secara Terbatas (Bisnis.com, 2026-01-27)

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Dedicated substationPLN · 120 MVA · 150kV · Mar 2025 Reported source ↗
GI 150 kV KTT Data Center, GIIC Cikarang, 2 x 60 MVA transformers, SLO issued; serves Komdigi and other GIIC DC operators (shared) · Applies to the whole campus.

Sources checked 2026-10-22

  1. itjen.komdigi.go.id
  2. katadata.co.id
  3. cnbcindonesia.com
  4. Komdigi Ungkap PDN I Mulai Beroperasi Secara Terbatas (Bisnis.com, 2026-01-27)

More in Greater Jakarta

Also run by Komdigi

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.