Pusat Data Nasional 1 (PDN Cikarang) is a data center project in Cikarang, Bekasi, Indonesia, operated by Kementerian Komunikasi dan Digital (Komdigi). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Record last checked against its sources on 22 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.
Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Pusat Data Nasional 1 (PDN Cikarang) has no published figure so it sits outside that ranking. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Komdigi has 1 other in Indonesia tracked by ArusGrid, including Pusat Data Nasional 3 (IKN / East Kalimantan). Named funding comes from Government of Indonesia (APBN) on the equity side and French government loan + commercial banks as debt. The named user of the compute is Government of Indonesia (ministries/agencies) (confirmed).
Power comes from PLN through a dedicated substation at 150 kV (reported, unconfirmed).
Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 27 January 2026, and last checked the record on 22 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Sovereign government cloud; published spec is CPU/storage-centric (25,000+ CPU cores, 200TB memory, 40PB storage) with no GPU, liquid-cooling or high-density disclosure.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Limited operation for low-risk government services since Jan 2026; full migration phased over 6 to 12 months · as of 2026-01-26
Minister Meutya Hafid said PDN 1 is operating in a limited capacity for low-risk services after BSSN feasibility and security testing from July to December 2025; Bisnis adds that remaining BSSN recommendations will be met over six to twelve months before wider ministry onboarding. No individual ministry named.
Source · Kemkomdigi operasikan Pusat Data Nasional 1 secara terbatas (ANTARA, 2026-01-26)
Source · Komdigi Ungkap PDN I Mulai Beroperasi Secara Terbatas (Bisnis.com, 2026-01-27)
No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.