Microsoft Indonesia Central data center (Jawa Barat)

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

Also listed as Microsoft JKT11.

Microsoft Indonesia Central data center (Jawa Barat) is a data center project in Cikarang, Bekasi, Indonesia, operated by Microsoft. It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 13 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Microsoft
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Microsoft Indonesia Central data center (Jawa Barat) has no published figure so it sits outside that ranking. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Microsoft has 1 other in Indonesia and 12 projects elsewhere in the dataset tracked by ArusGrid, including Microsoft JKT09 / JKT02 (KIIC Karawang campus). It sits on the Microsoft Jawa Barat campus alongside Microsoft JKT09 / JKT02 (KIIC Karawang campus). Named funding comes from Microsoft on the equity side. The named user of the compute is Microsoft (own use) (confirmed).

Power comes from PLN (UIP JBT / Pusmanpro) through a dedicated substation at 150 kV (reported, unconfirmed). Cooling uses evaporative cooling.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 29 April 2026, and last checked the record on 13 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Hyperscaler self-build; Microsoft describes Indonesia Central as 'hyperscale infrastructure built to support growth in AI'; Azure OpenAI services being brought in-region.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (Indonesia Central region live) · OperationalSize not published, target 2025

Who is behind it

OperatorMicrosoft · Hyperscaler self-build
Funder, EquityMicrosoft

Who uses the compute

Own use · hyperscalerMicrosoft (own use) · confirmed

Platform deals that include it

Microsoft US$1.7B Indonesia cloud & AI investment (2024 to 2028)
Country programme, 2024-04
US$1.7bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Land
Land sellerPT Puradelta Lestari Tbk (DMAS), Kota Deltamas / GIIC · Rp810bn (≈US$51m) · 2024 Reported source ↗
Buyer PT Microsoft Operations Indonesia; customer-level revenue in DMAS reporting
Power supply
Dedicated substationPLN (UIP JBT / Pusmanpro) · 150kV · Apr 2026 Reported source ↗
GI 150 kV Data Center Bay Microsoft, lines JKT 11 A & B at GIIC Deltamas completed; no MVA disclosed
Water and cooling
WaterIndustrial raw water · GIIC industrial estate (Kawasan Industri GIIC); KIIC also named for other sites Inferred by ArusGrid source ↗
Why we think so. Fact sheet names GIIC (Cikarang) as a water source; our Microsoft Cikarang entry is the only Microsoft site that fits GIIC.
CoolingEvaporative cooling Inferred by ArusGrid source ↗
Indirect evaporative cooling, water-cooled chillers in warmer periods (Indonesia region)

Sources checked 2026-10-13

  1. local.microsoft.com
  2. news.microsoft.com
  3. w.media
  4. PLN Rampungkan Infrastruktur Listrik Data Center Microsoft (Fortune Indonesia, 2026-04-29)
  5. Microsoft secures 200 MW renewable energy to power Indonesian data centers (W.Media, 2026-02-13)
  6. PLN completes substation for Microsoft data center (Petromindo, 2026-02-14)

Same campus, Microsoft Jawa Barat

More in Greater Jakarta

Also run by Microsoft

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.