Microsoft Singapore (Woodlands campus)

Singapore, Singapore · Singapore market

Microsoft Singapore (Woodlands campus) is a data center project in Singapore, operated by Microsoft. It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Microsoft
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and Microsoft Singapore (Woodlands campus) has no published figure so it sits outside that ranking. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Microsoft has 13 projects elsewhere in the dataset tracked by ArusGrid, including Microsoft JKT09 / JKT02 (KIIC Karawang campus), Microsoft Indonesia Central data center (Jawa Barat) and Microsoft Hyderabad Chandanvelly campus (HYD11). It sits on the Microsoft Woodlands campus. The named user of the compute is Microsoft (own use / Azure Southeast Asia) (confirmed).

The build is phased. Woodlands 1 is operational; Woodlands 2 is operational; DC-CFA award (~20MW, site undisclosed) at 20 MW is announced. Power comes from EDP Renewables (SolarNova 8) through a renewable power purchase agreement (reported, unconfirmed). Cooling uses reclaimed water from Reused water (NEWater implied, not named).

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 2 April 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

hyperscaler self-build (Azure)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Woodlands 1 · OperationalSize not published
Woodlands 2 · OperationalSize not published
DC-CFA award (~20MW, site undisclosed) · Announced20 MW

Who is behind it

OperatorMicrosoft · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerMicrosoft (own use / Azure Southeast Asia) · confirmed

DC-CFA 2023 awardee for new Singapore capacity (share of ~80MW not disclosed) · as of 2023-07-14

IMDA's regulator release names Microsoft as one of four DC-CFA awardees with a proposal anchoring AI and HPC compute in Singapore. IMDA does not name the site; Woodlands is Microsoft's existing Singapore campus and ArusGrid's row, so the building link is ArusGrid's rather than IMDA's.

Source · 4 Proposals Selected from Data Centre Application (IMDA, 2023-07-14)

Platform deals that include it

Microsoft Singapore cloud/AI commitment
Country programme, 2026-04
US$5.5bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Project team
Mechanical and electrical worksTechniques 83 · Apr 2015 · completed Confirmed source ↗
Mechanical ACMV sub-contract works (RFP P2-ME.03.ACMV, Phase 2 contract) for Microsoft SG2, a 9-storey data centre with offices, utility areas and a substation at 1 Woodlands Industrial Park E9. Work ran from Nov 2013 to Apr 2015.
Power supply
Renewable power dealEDP Renewables (SolarNova 8) · 200 MW · Sep 2024 Reported source ↗
200MWp rooftop solar on 1,176 public buildings, 20 years · Supports Singapore Azure region (3 AZs), not Woodlands specifically · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
WaterRecycled wastewater · Reused water (NEWater implied, not named) Inferred by ArusGrid source ↗
Why we think so. Fact sheet covers Microsoft's 3 operational Singapore datacentres without sites; Woodlands is our only Microsoft Singapore entry.
CoolingWater-cooled chillers Inferred by ArusGrid source ↗
Water-cooled chillers use reused water 100% of the year (country-level for SG sites)

Sources checked 2026-10-20

  1. datacentermap.com
  2. datacenterdynamics.com
  3. MICROSOFT SINGAPORE PTE LTD (Techniques 83)
  4. Microsoft commits to $5.5bn AI and cloud investment in Singapore by 2029 (DCD, 2026-04-02)

More in Singapore

Also run by Microsoft

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.