Keppel DC Singapore 3 is a data center project in Singapore, operated by Keppel Data Centres. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as operational on 2 February 2026. Record last checked against its sources on 12 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.
Singapore holds 39 active projects with 874 MW of planned IT load between them, and Keppel DC Singapore 3 has no published figure so it sits outside that ranking. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Keppel has 8 others in Singapore and 1 project elsewhere in the dataset tracked by ArusGrid, including Keppel DC SGP 11, Jurong Island (DC-CFA2), Keppel Floating Data Centre and DC1. It sits on the Keppel DC Singapore 3 campus. Named funding comes from Keppel DC REIT on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as operational on 2 February 2026.
Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 23 July 2026, and last checked the record on 12 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Pre-2020 colocation facility completed or last refurbished 2015. No liquid cooling or GPU deployment disclosed.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
The published band for Singapore is too wide to say anything useful about this building (range wider than half its midpoint, withheld), so no estimate is shown. The band itself is on the Colo prices page.
All projects in Singapore · All projects in Singapore · All Keppel projects · All projects operational · Data center rules in Singapore · Full directory