Google Singapore campus (Jurong West / Lok Yang) is a data center project in Singapore, operated by Google. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as operational on 3 June 2024. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Google
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and Google Singapore campus (Jurong West / Lok Yang) has no published figure so it sits outside that ranking. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Google has 8 projects elsewhere in the dataset tracked by ArusGrid, including Google Cloud Kuwait region (three sites), Google (Pearl Computing) Elmina Data Centre & Cloud Region and Google (Pearl Computing) Port Dickson. It sits on the Google Jurong West campus. Named users of the compute are Google (own use / GCP) (confirmed) and DBS Bank and GovTech Singapore (with CSIT, HTX) (reported, unconfirmed).

The build is phased. DC1 is operational with a 2014 target; DC2 is operational with a 2015 target; DC3 is operational with a 2022 target. The stage was recorded as operational on 3 June 2024. The money on record is US$5bn as of June 2024, the announced investment.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

hyperscaler self-build (GCP/TPU plausible)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

DC1 · OperationalSize not published, target 2014
DC2 · OperationalSize not published, target 2015
DC3 · OperationalSize not published, target 2022
DC4 · OperationalSize not published, target 2024
Lok Yang build · Under constructionSize not published

Stage history

2024-06-03Operational · googlecloudpresscorner.com

Who is behind it

OperatorGoogle · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerGoogle (own use / GCP) · confirmed
Runs compute here · enterpriseDBS Bank · reported, unconfirmed

Enterprise AI workloads with Singapore data residency on Google Cloud's Singapore region · as of 2025-08-28

Google Cloud's own release names DBS among customers whose AI workloads run with expanded Singapore data residency, meaning machine-learning processing stays inside Singapore. Google's Singapore region (asia-southeast1) is served from its Jurong West self-build campus, the only Google data centre in the country; the release does not name the building.

Source · Google Cloud Makes 'Gemini Everywhere' Vision a Reality, Doubles Down on Enterprise AI Commitment to Singapore (Google Cloud, 2025-08-28)

Runs compute here · governmentGovTech Singapore (with CSIT, HTX) · reported, unconfirmed

Public-sector Gemini and Vertex AI workloads with Singapore data residency; CSIT, HTX and NUS also named · as of 2025-08-28

Same Google Cloud release names GovTech, CSIT, HTX and NUS as Singapore public-sector users of Gemini services with in-country ML processing on the Singapore region, which Google serves from Jurong West. Building not named by Google.

Source · Google Cloud Makes 'Gemini Everywhere' Vision a Reality, Doubles Down on Enterprise AI Commitment to Singapore (Google Cloud, 2025-08-28)

Source · Google Cloud expands Gemini AI, strengthens Singapore focus (Singapore EDB, 2025-08-28)

Money at this site

Announced investment, 2024-06US$5bn

The figure covers several facilities.

It includes GPUs and IT hardware, so it is not comparable with building cost.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. googlecloudpresscorner.com
  2. baxtel.com
  3. datacentermap.com

More in Singapore

Also run by Google

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.