Google Singapore campus (Jurong West / Lok Yang) is a data center project in Singapore, operated by Google. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as operational on 3 June 2024. Record last checked against its sources on 19 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.
Singapore holds 39 active projects with 874 MW of planned IT load between them, and Google Singapore campus (Jurong West / Lok Yang) has no published figure so it sits outside that ranking. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Google has 8 projects elsewhere in the dataset tracked by ArusGrid, including Google Cloud Kuwait region (three sites), Google (Pearl Computing) Elmina Data Centre & Cloud Region and Google (Pearl Computing) Port Dickson. It sits on the Google Jurong West campus. Named users of the compute are Google (own use / GCP) (confirmed) and DBS Bank and GovTech Singapore (with CSIT, HTX) (reported, unconfirmed).
The build is phased. DC1 is operational with a 2014 target; DC2 is operational with a 2015 target; DC3 is operational with a 2022 target. The stage was recorded as operational on 3 June 2024. The money on record is US$5bn as of June 2024, the announced investment.
Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, and last checked the record on 19 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
hyperscaler self-build (GCP/TPU plausible)
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Enterprise AI workloads with Singapore data residency on Google Cloud's Singapore region · as of 2025-08-28
Google Cloud's own release names DBS among customers whose AI workloads run with expanded Singapore data residency, meaning machine-learning processing stays inside Singapore. Google's Singapore region (asia-southeast1) is served from its Jurong West self-build campus, the only Google data centre in the country; the release does not name the building.
Source · Google Cloud Makes 'Gemini Everywhere' Vision a Reality, Doubles Down on Enterprise AI Commitment to Singapore (Google Cloud, 2025-08-28)
Public-sector Gemini and Vertex AI workloads with Singapore data residency; CSIT, HTX and NUS also named · as of 2025-08-28
Same Google Cloud release names GovTech, CSIT, HTX and NUS as Singapore public-sector users of Gemini services with in-country ML processing on the Singapore region, which Google serves from Jurong West. Building not named by Google.
Source · Google Cloud Makes 'Gemini Everywhere' Vision a Reality, Doubles Down on Enterprise AI Commitment to Singapore (Google Cloud, 2025-08-28)
Source · Google Cloud expands Gemini AI, strengthens Singapore focus (Singapore EDB, 2025-08-28)
The figure covers several facilities.
It includes GPUs and IT hardware, so it is not comparable with building cost.
An own-use build. No colocation price applies.
All projects in Singapore · All projects in Singapore · All Google projects · All projects operational · Data center rules in Singapore · Full directory