Google (Pearl Computing) Puncak Alam data center

Puncak Alam, Selangor, Malaysia · Klang Valley market · location approximate to district level

Also listed as Google data center Puncak Alam and Puncak Alam data centre.

Google (Pearl Computing) Puncak Alam is a data center project in Puncak Alam, Malaysia, operated by Google (Pearl Computing Malaysia). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as under construction on 15 May 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Google (Pearl Computing Malaysia)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Strong6 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Google (Pearl Computing) Puncak Alam has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

Google has 4 others in Malaysia and 4 projects elsewhere in the dataset tracked by ArusGrid, including Google (Pearl Computing) Elmina Data Centre & Cloud Region, Google (Pearl Computing) Port Dickson and Google (reported) Serendah Campus. It sits on the Eco Business Park V. Named funding comes from EcoWorld (Quantum Alpha). The named user of the compute is Google (Pearl Computing Malaysia Sdn Bhd) (confirmed).

The stage was recorded as under construction on 15 May 2026. The money on record is RM1,880m (about US$420m) as of January 2026, debt raised, which ArusGrid keeps out of capital totals.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 13 February 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Google hyperscaler campus announced Feb 2025 (build-and-lease + owned parcel)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-05-15Under construction · businesstoday.com.my

Who is behind it

OperatorGoogle (Pearl Computing Malaysia) · Hyperscaler self-build
Funder, Joint venture partnerEcoWorld (Quantum Alpha)

Who uses the compute

Own use · hyperscalerGoogle (Pearl Computing Malaysia Sdn Bhd) · confirmed

Full facility, 92.44 acres built and leased by Quantum Alpha Sdn Bhd (EcoWorld) at Eco Business Park V, plus 58.187 acres sold outright for RM266.1m; lease up to RM4.8bn over 20 years · as of 2025-02-25

The Edge reports EcoWorld's Bursa filing, in which Paragon Pinnacle Sdn Bhd sells 58.187 acres to Pearl Computing Malaysia Sdn Bhd and Quantum Alpha Sdn Bhd builds and leases a data centre on 92.44 acres at Eco Business Park V, with Pearl described in the filing as 'an affiliate of Google'. The landlord's filing itself ties the SPV to Google.

Source · EcoWorld to sell RM266m land, lease data centre to Google affiliate (The Edge Malaysia, 2025-02-25)

Source · Malaysia's EcoWorld sells and leases land outside Kuala Lumpur to Google for data center (DCD, 2025-02-25)

Money at this site

Debt raised, 2026-01RM1,880m (about US$420m)

This is the size of a loan. ArusGrid excludes it from capital spending totals.

The figure covers the whole campus.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Project team
Core and shell builderGamuda Engineering Sdn Bhd · RM2.14bn (≈US$482m) · Aug 2025 Confirmed source ↗
Shell and core of two DC blocks, consumer substation, water reservoir; 3Q2025 to 3Q2027
Mechanical and electrical worksSJEE Engineering Sdn Bhd · RM105m (≈US$24m) · Aug 2026 Inferred by ArusGrid source ↗
Electrical Package #3 (MV02 and MV03), subcontract; 2026-07-21 to 2027-10-14
Why we think so. Puncak Alam hyperscale DC under a local main contractor; our only Puncak Alam project is Google's EBP V build where Gamuda is main contractor.
BidderSunway Construction Group Bhd · Jul 2025 · bid submitted, result pending Reported source ↗
Tipped contender for EcoWorld EBP V core and shell (Pearl Computing); Gamuda later won
Land
Land sellerEco World Development Group Bhd (Paragon Pinnacle Sdn Bhd / Quantum Alpha Sdn Bhd) · 58.187 acres · RM266.1m (≈US$60m) · Feb 2025 Confirmed source ↗
Eco Business Park V; buyer Pearl Computing Malaysia Sdn Bhd
LandlordEco World Development Group Bhd (Quantum Alpha Sdn Bhd) · 92.44 acres · RM4.8bn (≈US$1.1bn) · leased · Feb 2025 Confirmed source ↗
Build-and-lease of shell and core to Pearl Computing; 20yr + 2x5yr options; est. total rent RM4.8bn; completion Oct 2027
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTRC Construction Sdn Bhd · Utility infrastructure · RM149.98m (≈US$34m) · Aug 2026 source ↗
This project is one of 2 that fit. The other is Google (Pearl Computing) Port Dickson.
UnconfirmedSJEE Engineering Sdn Bhd · Mechanical and electrical works · RM146.53m (≈US$33m) · Aug 2026 source ↗
This project is one of 2 that fit. The other is Google Elmina 2 (SDP EBP Asset II).

Sources checked 2026-10-19

  1. datacenterdynamics.com
  2. theedgemalaysia.com
  3. Wawasan Dengkil Awarded RM24 Million Subcontract For Data Centre By Gamuda (BusinessToday, 2026-02-13)

More in Klang Valley

Also run by Google

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.