ArusGridProject
Directory › Vietnam › Da Nang / Central VN › AIDC DeCenter (IPTP Networks)

AIDC DeCenter (IPTP Networks) data center

Da Nang (Hoa Vang), Da Nang, Vietnam · Da Nang / Central VN market · location approximate to district level

AIDC DeCenter (IPTP Networks) is a data center project in Da Nang (Hoa Vang), Vietnam, operated by IPTP Networks. It is at the land and permitting stage. It is planned for 10 MW of IT load.

Latest change on record: entered the record as land and permitting on 28 August 2025. Record last checked against its sources on 13 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
10 MW
Running now
Not disclosed
Operators rarely publish this
Operator
IPTP Networks
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Long shot1 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

Da Nang / Central VN holds 2 active projects with 20 MW of planned IT load between them, and AIDC DeCenter (IPTP Networks) ranks first by planned capacity. Of those, 1 is at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Da Nang / Central VN, and ArusGrid does not estimate one.

It is the only IPTP Networks project ArusGrid tracks. It sits on the Da Nang Hi-Tech Park alongside Vietnam Data Gen AI Data Centre Network (Phase 1, Da Nang). Named funding comes from IPTP Networks on the equity side. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 28 August 2025. The money on record is US$200m as of March 2026, the announced investment.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 6 public sources for this project, the latest dated 28 November 2025, and last checked the record on 13 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Marketed as Vietnam's first AI-ready international data centre, designed as core infrastructure for AI and blockchain workloads. No cooling spec, no tenant.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Phases

Phase 1 · Land and permittingSize not published, target Q4 2027

Stage history

2025-08-28Land and permitting · nhandan.vn

Who is behind it

OperatorIPTP Networks · Colocation
Funder, EquityIPTP Networks

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-03US$200m

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-13

  1. vietnamnet.vn
  2. vietnam.vn
  3. en.vietnamplus.vn
  4. Đà Nẵng khởi động dự án Trung tâm dữ liệu AI 200 triệu USD (Nhân Dân, 2025-08-28)
  5. 1,17 tỷ USD đã "đổ" về Khu công nghệ cao Đà Nẵng (VnEconomy, 2025-11-23)
  6. Đà Nẵng thu hút hơn 1,17 tỷ USD vào công nghệ cao (Nhà Đầu tư, 2025-11-28)

Same campus, Da Nang Hi-Tech Park

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.