Vietnam Data Gen AI Data Centre Network (Phase 1, Da Nang)

Da Nang (Hoa Vang), Da Nang, Vietnam · Da Nang / Central VN market · location approximate to district level

Vietnam Data Gen AI Data Centre Network (Phase 1, Da Nang) is a data center project in Da Nang (Hoa Vang), Vietnam, operated by Vietnam Data Gen (Create Capital Vietnam / Haimaker.ai JV). It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 10 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as announced on 29 December 2025. Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
10 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Vietnam Data Gen (Create Capital Vietnam / Haimaker.ai JV)
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

Da Nang / Central VN holds 2 active projects with 20 MW of planned IT load between them, and Vietnam Data Gen AI Data Centre Network (Phase 1, Da Nang) ranks second by planned capacity. Of those, 1 is at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Da Nang / Central VN, and ArusGrid does not estimate one.

It is the only Vietnam Data Gen project ArusGrid tracks. It sits on the Da Nang Hi-Tech Park alongside AIDC DeCenter (IPTP Networks). Named funding comes from Create Capital Vietnam and Haimaker.ai. The named user of the compute is CEH Information Technology Services Co Ltd (Công ty TNHH Dịch vụ công nghệ thông tin CEH) (reported, unconfirmed).

The build is phased. Phase 1 (Da Nang, stated 10-20MW) is announced; Phase 2 (stated 40-60MW) is announced; Phase 3 (100MW network) is announced. The stage was recorded as announced only on 29 December 2025.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 4 public sources for this project, the latest dated 29 December 2025, and last checked the record on 20 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Purpose-built AI/GPU network: 'high-density rack model suited to GPU compute systems'; target customers are government, banks, telcos, cloud providers and AI developers; framed by a government adviser as underpinning 'AI-sovereign Vietnam'. No cooling spec, no GPU order, no site works.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Phases

Phase 1 (Da Nang, stated 10-20MW) · AnnouncedSize not published
Phase 2 (stated 40-60MW) · AnnouncedSize not published
Phase 3 (100MW network) · AnnouncedSize not published

Stage history

2025-12-29Announced · theinvestor.vn

Who is behind it

OperatorVietnam Data Gen (Create Capital Vietnam / Haimaker.ai JV) · Joint venture
Funder, Joint venture partnerCreate Capital Vietnam
Funder, Joint venture partnerHaimaker.ai

Who uses the compute

Runs compute here · enterpriseCEH Information Technology Services Co Ltd (Công ty TNHH Dịch vụ công nghệ thông tin CEH) · reported, unconfirmed

First customer of Vietnam Data Gen. Signed a service agreement on 11 Dec. Not tied to a named site. · as of 2025-12-25

VietNamNet names CEH as the first customer with a signed service agreement.

Source · Hợp tác phát triển mạng lưới trung tâm dữ liệu AI chủ quyền tại Việt Nam (VietNamNet, 2025-12-25)

Checked on 2026-10-03. No document names a confirmed user beyond the rows above.

Platform deals that include it

Vietnam Data Gen 100MW AI data centre network
Platform capital, 2025-12
US$1.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-20

  1. vnexpress.net
  2. baotuyenquang.com.vn
  3. Create Capital Vietnam, Haimaker.ai plan $1 bln AI data center network (The Investor (VAFIE), 2025-12-29)
  4. Hợp tác phát triển mạng lưới trung tâm dữ liệu AI chủ quyền tại Việt Nam (VietNamNet, 2025-12-25)

Same campus, Da Nang Hi-Tech Park

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.