G-Campus Hoa Lac (High-Tech & Data Centre Complex) is a data center project in Hoa Lac, Vietnam, operated by G-Group Technology. It is at the land and permitting stage. It is planned for 20 MW of IT load.
Latest change on record: entered the record as land and permitting on 29 June 2026. Record last checked against its sources on 22 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.
Hanoi metro holds 6 active projects with 110 MW of planned IT load between them, and G-Campus Hoa Lac (High-Tech & Data Centre Complex) ranks third by planned capacity. Of those, 3 are operational, 1 is under construction, 1 is at the land and permitting stage and 1 is announced only. No third party publishes a colocation vacancy rate for Hanoi metro, and ArusGrid does not estimate one.
It is the only G-Group project ArusGrid tracks. It sits on the Hoa Lac Hi-Tech Park alongside National Data Center No.1, VNPT IDC Hoa Lac and Viettel IDC Hoa Lac. Named funding comes from G-Group Technology on the equity side and OTECH (Omantel Group). No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The build is phased. Phase 1 at 20 MW is land and permitting; Expansion at 30 MW is announced. The stage was recorded as at the land and permitting stage on 29 June 2026. The money on record is VND 7,600bn (about US$289m) as of June 2026, a government approval ceiling. Cooling uses direct liquid cooling.
Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 8 public sources for this project, the latest dated 6 July 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Dated source states the phase-1 20MW IT load uses DIRECT-TO-CHIP LIQUID COOLING for AI/HPC systems (Znews / VietnamNet / Bao Dau Tu, 29 Jun 2026). That meets our 'confirmed' bar.
Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.
Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source
Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.
The figure covers the whole campus.
No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Hanoi metro · All projects in Vietnam · All projects at the land and permitting stage · Data center rules in Vietnam · Full directory