Doma (DIG) / Silicon Tech Park EEC Data Center Parks is a data center project in Chachoengsao / Chonburi / Rayong (3 parks), Thailand, operated by Doma Infrastructure Group (DIG). It has been announced and has not yet reached the land or permitting stage. The only published capacity figure is 1,500 MW of total facility power. IT load will be lower.
Record last checked against its sources on 22 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Doma (DIG) / Silicon Tech Park EEC Data Center Parks ranks first by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.
It is the only Doma project ArusGrid tracks. It sits on the Doma-STP EEC parks. Named funding comes from Silicon Tech Park. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
Power comes from Not named (reported, unconfirmed).
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, and last checked the record on 22 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Stated purpose: AI-ready core-and-shell parks for hyperscalers and GPU-as-a-service providers.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.