ArusGridProject
Directory › Thailand › EEC (Eastern Seaboard) › Doma (DIG) / Silicon Tech Park EEC Data Center Parks

Doma (DIG) / Silicon Tech Park EEC Data Center Parks

Chachoengsao / Chonburi / Rayong (3 parks), Chachoengsao, Thailand · EEC (Eastern Seaboard) market · location approximate to city level

Doma (DIG) / Silicon Tech Park EEC Data Center Parks is a data center project in Chachoengsao / Chonburi / Rayong (3 parks), Thailand, operated by Doma Infrastructure Group (DIG). It has been announced and has not yet reached the land or permitting stage. The only published capacity figure is 1,500 MW of total facility power. IT load will be lower.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
1,500 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
Doma Infrastructure Group (DIG)
Colocation
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Doma (DIG) / Silicon Tech Park EEC Data Center Parks ranks first by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.

It is the only Doma project ArusGrid tracks. It sits on the Doma-STP EEC parks. Named funding comes from Silicon Tech Park. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Power comes from Not named (reported, unconfirmed).

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, and last checked the record on 22 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

Stated purpose: AI-ready core-and-shell parks for hyperscalers and GPU-as-a-service providers.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorDoma Infrastructure Group (DIG) · Colocation
Funder, Joint venture partnerSilicon Tech Park

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Site300 acres · freehold · Dec 2024 Reported source ↗
300 acres of freehold land across Chachoengsao, Chonburi and Rayong. Seller not named.
Power supply
Power allocation or planNot named · 1,500 MW · Dec 2024 Reported source ↗
The CEO says most of the planned 1.5GW is secured. Solar is cited and hydro imports from Laos are under negotiation. No supplier is named. · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling

Sources checked 2026-10-22

  1. datacenterdynamics.com
  2. w.media
  3. baxtel.com
  4. baxtel.com

More in EEC (Eastern Seaboard)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.