Also listed as 云上天府, 云上天府云计算中心 and Yunshang Tianfu.
Sichuan Yunshang Tianfu Cloud Computing Centre, Deyang (四川云上天府云计算中心) is a data center project in Tianfu Digital Valley, Jingyang District, Deyang, China, operated by Sichuan Yunshang Tianfu Technology (四川云上天府科技有限公司). It is operational. The operator has not published an IT load figure. It is planned for 6,120 racks. ArusGrid does not convert racks into MW.
Latest change on record: moved to operational on 26 September 2023. Record last checked against its sources on 22 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
Tianfu (Chengdu) holds 6 active projects with 0 MW of planned IT load between them, and Sichuan Yunshang Tianfu Cloud Computing Centre, Deyang (四川云上天府云计算中心) has no published figure so it sits outside that ranking. Of those, 3 are operational, 2 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Tianfu (Chengdu), and ArusGrid does not estimate one.
It is the only Yunshang Tianfu project ArusGrid tracks. It sits on the Tianfu Digital Valley (天府数谷) campus. Named users of the compute are 杭州海康威视数字技术股份有限公司 (Hikvision), 四川见山科技有限责任公司 and Deyang municipal government (德阳城市大脑) (reported, unconfirmed).
The dated record runs from under construction on 23 February 2022 to operational on 26 September 2023. The money on record is CN¥4bn as of May 2026, the announced investment. Cooling uses evaporative cooling, with a design PUE of 1.2.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 6 public sources for this project, the latest dated 2 May 2026, and last checked the record on 22 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
No public signal either way.
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Cooperation agreement signed at the opening ceremony. Contract value not given. · as of 2023-09-26
Sichuan Online reports Hikvision signed a cooperation agreement at the 26 Sep 2023 opening.
Source · 可容纳10万台服务器 云上天府智算中心在德阳正式投运 (四川在线, 2023-09-26)
Cooperation agreement signed at the opening ceremony. Contract value not given. · as of 2023-09-26
Sichuan Online reports the firm signed a cooperation agreement at the 26 Sep 2023 opening.
Source · 可容纳10万台服务器 云上天府智算中心在德阳正式投运 (四川在线, 2023-09-26)
Compute and storage for the Deyang city brain platform and for market regulation, emergency and fire safety applications. · as of 2023-09-26
Sichuan Online says the centre already provides compute and storage for these city platforms.
Source · 可容纳10万台服务器 云上天府智算中心在德阳正式投运 (四川在线, 2023-09-26)
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Tianfu (Chengdu) · All projects in China · All projects operational · Full directory