Huailai › CapitalOnline Huailai Data Centre, Jingbei Cloud Computing R&D Centre (首都在线京北云计算软件研发中心项目-算力中心)
CapitalOnline Huailai Data Centre, Jingbei Cloud Computing R&D Centre (首都在线京北云计算软件研发中心项目-算力中心)
Zhangjiakou, Hebei, China · Huailai market · location approximate to city level
CapitalOnline Huailai Data Centre, Jingbei Cloud Computing R&D Centre (首都在线京北云计算软件研发中心项目-算力中心) is a data center project in Zhangjiakou, China, operated by CapitalOnline (首都在线). It is operational. It is planned for 50 MW of IT load. The operator reports 10 MW running.
Latest change on record: moved to operational on 12 October 2026. Record last checked against its sources on 22 October 2026.
Running now
10 MW
Operators rarely publish this
Operator
CapitalOnline (首都在线)
cloud
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.
Where it sits
Huailai holds 8 active projects with 1,344 MW of planned IT load between them, and CapitalOnline Huailai Data Centre, Jingbei Cloud Computing R&D Centre (首都在线京北云计算软件研发中心项目-算力中心) ranks 5th by planned capacity. Of those, 2 are operational, 5 are operational and expanding and 1 is under construction. No third party publishes a colocation vacancy rate for Huailai, and ArusGrid does not estimate one.
It is the only CapitalOnline project ArusGrid tracks. It sits on the CapitalOnline Huailai campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. Phase 1, building 1# is under construction; Phase 2, buildings 2# and 3#, about 40 MW at 40 MW is announced. The dated record runs from under construction on 21 September 2026 to operational on 12 October 2026. The money on record is CN¥787.01m as of September 2026, the announced investment.
The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 7 public sources for this project, the latest dated 21 October 2026, and last checked the record on 22 October 2026.
How well evidenced is it
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes
AI workloads
StatusLikely
Phase 1 high-power racks leased in full to a major internet company for AI training (人民财讯, Oct 2026).
Access to AI chips
GradeLicence required for a party
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo
Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source
Phases
Phase 1, building 1# · Under constructionSize not published
Phase 2, buildings 2# and 3#, about 40 MW · Announced40 MW
Stage history
Who is behind it
OperatorCapitalOnline (首都在线) · cloud
Who uses the compute
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
Money at this site
Announced investment, 2026-09CN¥787.01m
Colocation price per kW of IT load per month
No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
Project team
Main contractor中建一局集团第三建筑有限公司 · Jun 2026 · completed Confirmed source ↗ General contractor for AIDC phase 1: the A01 data centre building, the generator steel platform and the class B liquid tank area civil works.
Civil and structural works中北兴宇建设工程有限公司 · Jun 2026 · completed Confirmed source ↗ Subcontract under 中建一局第三公司 for steel structure, AIDC phase 1.
Civil and structural works中企万鑫(北京)建设有限公司 · Jun 2026 · completed Confirmed source ↗ Subcontract under 中建一局第三公司 for secondary structure, AIDC phase 1.
Civil and structural works河南省润锋基实业(集团)有限公司 · Jun 2026 · completed Confirmed source ↗ Subcontract under 中建一局第三公司 for waterproofing, AIDC phase 1.
Piling and earthworks北京国泰嘉业建设有限公司 · Jun 2026 · completed Confirmed source ↗ Subcontract under 中建一局第三公司 for pile foundations and shotcrete anchored slope support, AIDC phase 1.
Piling and earthworks怀来东吉商贸有限公司 · Jun 2026 · completed Confirmed source ↗ Subcontract under 中建一局第三公司 for earth excavation and backfill, AIDC phase 1.
Mechanical and electrical works长城电梯集团北京机电工程有限公司 · Jun 2026 · completed Confirmed source ↗ Subcontract under 中建一局第三公司 for indoor lift installation, AIDC phase 1.
Land
Site18,926.49 sqm · Sep 2026 Confirmed source ↗ Company-owned land (自有土地), about 28.39 mu per filing. Counterparty and grant terms not disclosed.
Sources checked 2026-10-22
- 2026年度向特定对象发行A股股票募集资金使用可行性分析报告(修订稿) (北京首都在线科技股份有限公司, 2026-09-21)
- 首都在线怀来数据中心一期与某互联网头部企业达成合作 (人民财讯 (东方财富网转载), 2026-10-11)
- 签约头部互联网企业 首都在线怀来智算项目转入运营阶段 (Eastmoney, 2026-10-12)
- 一期进度仅三成,再募15.87亿 首都在线定增逻辑待解 (China Fund News (中国基金报), 2026-04-14)
- 关于北京首都在线科技股份有限公司申请向特定对象发行股票的审核问询函的回复(修订稿) (北京首都在线科技股份有限公司 (深圳证券交易所), 2026-10-21)
- 2026年三季度报告 (北京首都在线科技股份有限公司 (深圳证券交易所), 2026-10-21)
- 关于北京首都在线科技股份有限公司申请向特定对象发行股票的审核问询函的回复(修订稿) (北京首都在线科技股份有限公司 (巨潮资讯网), 2026-10-21)
More in Huailai
All projects in Huailai · All projects in China · All projects operational · Full directory