ArusGridProject
Directory › China › Ulanqab › UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心)

UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心) data center

Jining District, Ulanqab (Chahar High-Tech Zone), Inner Mongolia, China · Ulanqab market · location approximate to district level

Also listed as 优刻得乌兰察布数据中心 and UCloud Wulanchabu.

UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心) is a data center project in Jining District, Ulanqab (Chahar High-Tech Zone), China, operated by UCloud Technology (优刻得). It is operational and expanding. It is planned for 62 MW of IT load.

Latest change on record: entered the record as expanding on 18 June 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
62 MW
Running now
Not disclosed
Operators rarely publish this
Operator
UCloud Technology (优刻得)
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Ulanqab holds 18 active projects with 1,262 MW of planned IT load between them, and UCloud Ulanqab Intelligent Computing Centre (优刻得乌兰察布智算中心) ranks second by planned capacity. Of those, 4 are operational, 4 are operational and expanding, 1 is under construction, 2 are at the land and permitting stage and 7 are announced only. No third party publishes a colocation vacancy rate for Ulanqab, and ArusGrid does not estimate one.

It is the only UCloud project ArusGrid tracks. It sits on the UCloud Ulanqab campus. Named users of the compute are 秘塔科技 (Metaso), 科大讯飞 (iFlytek), 达观数据 (Datagrand), 仟传科技 and 出门问问 (Mobvoi) (reported, unconfirmed).

The build is phased. Buildings A to C at 62 MW is operational; Buildings D and E is under construction. The stage was recorded as operational and expanding on 18 June 2026. Power comes from UCloud (self-built substation) through a dedicated substation at 110 kV. Cooling uses immersion cooling.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 13 public sources for this project, the latest dated 14 October 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

The operator calls it an intelligent computing centre and runs AI inference capacity there; rack utilisation was over 95% at 30 June 2026.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

Buildings A to C · Operational62 MW
Buildings D and E · Under constructionSize not published

Stage history

2026-06-18Expanding · sfccn.com

Who is behind it

OperatorUCloud Technology (优刻得) · Colocation

Who uses the compute

Runs compute here · AI lab秘塔科技 (Metaso) · reported, unconfirmed

AI training and inference compute · as of 2025-06-04

DOIT says UCloud has served these AI firms through the Ulanqab centre.

Source · 优刻得算力上新!2300+高电机柜已就绪 (DOIT, 2025-06-04)

Runs compute here · enterprise科大讯飞 (iFlytek) · reported, unconfirmed

AI training and inference compute · as of 2025-06-04

DOIT says UCloud has served these AI firms through the Ulanqab centre.

Source · 优刻得算力上新!2300+高电机柜已就绪 (DOIT, 2025-06-04)

Runs compute here · enterprise达观数据 (Datagrand) · reported, unconfirmed

AI training and inference compute · as of 2025-06-04

DOIT says UCloud has served these AI firms through the Ulanqab centre.

Source · 优刻得算力上新!2300+高电机柜已就绪 (DOIT, 2025-06-04)

Runs compute here · enterprise仟传科技 · reported, unconfirmed

AI training and inference compute · as of 2025-06-04

DOIT says UCloud has served these AI firms through the Ulanqab centre.

Source · 优刻得算力上新!2300+高电机柜已就绪 (DOIT, 2025-06-04)

Runs compute here · AI lab出门问问 (Mobvoi) · reported, unconfirmed

AI training and inference compute · as of 2025-06-04

DOIT says UCloud has served these AI firms through the Ulanqab centre.

Source · 优刻得算力上新!2300+高电机柜已就绪 (DOIT, 2025-06-04)

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractor中建-大成建筑有限责任公司 (China State Construction Dacheng) · Jul 2026 Reported source ↗
Civil and MEP general contract (土建+机电总承包) for Building D of the Ulanqab intelligent computing centre, about 29,000 sqm of floor area. Seen through the contractor's own subcontract procurement notices (cladding in Jul 2026, precision air conditioning in Aug 2026).
Power supply
Grid supplyJun 2026 Reported source ↗
Large-industrial power costs 0.47 to 0.48 yuan per kWh and can drop to 0.43 yuan or less through green direct supply and market trading. · Dual grid feeds with 14 power rooms. Backup is 12 Cummins diesel generators of 1,800 kW each at 10.5 kV. That backup total of 21.6 MW is our arithmetic, not an IT load. · Applies to the whole campus.
Dedicated substationUCloud (self-built substation) · 110kV · Oct 2026 Confirmed source ↗
About 80% of power is green power. · Dual 110kV grid feeds into a self-built substation. A 2025 article adds that each building has dual 20MW supply. · Applies to the whole campus.
Water and cooling
CoolingImmersion cooling Reported source ↗
Reporter saw servers fully immersed in coolant in liquid-cooled racks. Share of campus on immersion not stated.

Sources checked 2026-10-22

  1. 优刻得再投18亿扩智算中心:亏损云厂商的算力赌注 (蓝鲨财经社 (NetEase 网易号), 2026-08-03)
  2. 优刻得拟定增募资不超15亿元,用于乌兰察布智算中心及智算集群项目 (澎湃新闻, 2026-03-20)
  3. 探访优刻得Token工厂:乌兰察布的风与光,撑起你的AI对话 (21世纪经济报道 / 南方财经网, 2026-06-18)
  4. 优刻得:公司乌兰察布数据中心机柜利用率已超过 95%,青浦智算中心利用率持续爬坡 (证券市场周刊, 2026-08-05)
  5. 优刻得15亿定增终止 此前称募投项目“经济效益前景良好” (财联社 via 东方财富网, 2026-09-03)
  6. 优刻得科技股份有限公司第三届董事会第十一次会议决议公告 (2026-014) (中国证券报 (statutory disclosure), 2026-03-21)
  7. 分析丨大厂数据中心纷纷落地,算力的出路在乌兰察布? (腾讯新闻 (AI芯天下), 2023-09-01)
  8. 优刻得:乌兰察布智算中心与原计划不存在偏差,且目前客户订单覆盖度较高 (财闻网, 2026-09-07)
  9. 优刻得乌兰察布智算中心D楼封顶,加速构建AI时代智算底座 (中华网, 2026-06-17)
  10. 从土豆到词元:乌兰察布“风口”上的优刻得 (优刻得官微 (via 同花顺), 2026-10-14)
  11. 优刻得算力上新!2300+高电机柜已就绪 (DOIT, 2025-06-04)
  12. 中建-大成公司【优刻得乌兰察布智算中心D楼土建+机电总承包工程】项目 (招标采购导航网 (okcis.cn), 2026-07-15)
  13. 内蒙古优刻得科技有限责任公司内蒙古乌兰察布市集宁区优刻得数据中心项目变更二期B楼、仓库楼竣工环境保护验收监测报告表 (销邦招标平台, 2026-01-29)

More in Ulanqab

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.