Kota Petra Green Technology Park AI DCs is a data center project in Kuching (Petra Jaya), Malaysia, operated by Zecon Berhad. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Record last checked against its sources on 17 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Sarawak & E. Malaysia holds 3 active projects with 17 MW of planned IT load between them, and Kota Petra Green Technology Park AI DCs has no published figure so it sits outside that ranking. Of those, 1 is at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for Sarawak & E. Malaysia, and ArusGrid does not estimate one.
It is the only Zecon project ArusGrid tracks. It sits on the Kota Petra Green Technology Park. Named funding comes from Pelaburan Hartanah Berhad and Sarawak Digital Economy Corporation. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 19 August 2026, and last checked the record on 17 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Stated AI purpose (six Tier IV AI DCs claimed, Oct 2024 MoU), weakest likely grade
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Sarawak & E. Malaysia · All projects in Malaysia · All projects announced only · Data center rules in Malaysia · Full directory