Converge Angeles Data Center

Angeles City, Pampanga, Philippines · Clark / Central Luzon market · location approximate to city level

Converge Angeles Data Center is a data center project in Angeles City, Philippines, operated by Converge ICT Solutions. It is operational. It is planned for 12 MW of IT load. The operator reports 12 MW running.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
12 MW
Running now
12 MW
Operators rarely publish this
Operator
Converge ICT Solutions
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Philippines approves, powers and taxes data centers is on Data center rules in Philippines.

Where it sits

Converge Angeles Data Center is the only active project ArusGrid tracks in Clark / Central Luzon, at 12 MW of planned IT load. No third party publishes a colocation vacancy rate for Clark / Central Luzon, and ArusGrid does not estimate one.

It is the only Converge ICT project ArusGrid tracks. Named funding comes from Converge ICT Solutions on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The money on record is PHP 5bn (about US$87m) as of March 2026, the announced investment. Power comes from Greencore Geothermal (First Gen) through a renewable power purchase agreement.

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 28 August 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Opened Mar 2026 as a 'scalable AI-ready facility' hosting Converge Cloud, Converge's sovereign-cloud offering aimed at AI startups (BusinessWorld/Inquirer/StartupNewsPH, Mar 2026). Stated AI purpose = 'likely'. No cooling spec or GPU count published.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Installed capacity · Operational12 MW, target 2026

Who is behind it

OperatorConverge ICT Solutions · Telco
Funder, EquityConverge ICT Solutions

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-03PHP 5bn (about US$87m)

Platform deals that include it

Converge ICT 2026 capex guidance
Other
US$400m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Philippines, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Renewable power dealGreencore Geothermal (First Gen) · 7.2 MW · Apr 2022 Inferred by ArusGrid source ↗
Geothermal supply under a retail competition and open access contract. · Two-year retail supply contract to 2024, reported as 14.4MW in total or 7.2MW a year. Renewal not confirmed.
Why we think so. Converge's Pampanga data centre run by ComClark; our only Converge project in Pampanga is the Angeles City facility.

Sources checked 2026-10-21

  1. bworldonline.com
  2. business.inquirer.net
  3. datacenterdynamics.com
  4. startupnews.ph
  5. Converge accelerates enterprise growth engine as Angeles Data Center secures national strategic investment status (Converge ICT, 2026-08-27)
  6. Converge data center gets 'green lane' tag (Inquirer, 2026-08-28)
  7. Converge Angeles Data Center joins PH's P6.4 trillion green lane pipeline (Insider PH, 2026-08-27)
Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.