Converge Angeles Data Center is a data center project in Angeles City, Philippines, operated by Converge ICT Solutions. It is operational. It is planned for 12 MW of IT load. The operator reports 12 MW running.
Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Philippines approves, powers and taxes data centers is on Data center rules in Philippines.
Converge Angeles Data Center is the only active project ArusGrid tracks in Clark / Central Luzon, at 12 MW of planned IT load. No third party publishes a colocation vacancy rate for Clark / Central Luzon, and ArusGrid does not estimate one.
It is the only Converge ICT project ArusGrid tracks. Named funding comes from Converge ICT Solutions on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The money on record is PHP 5bn (about US$87m) as of March 2026, the announced investment. Power comes from Greencore Geothermal (First Gen) through a renewable power purchase agreement.
Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 28 August 2026, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Opened Mar 2026 as a 'scalable AI-ready facility' hosting Converge Cloud, Converge's sovereign-cloud offering aimed at AI startups (BusinessWorld/Inquirer/StartupNewsPH, Mar 2026). Stated AI purpose = 'likely'. No cooling spec or GPU count published.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Platform capital spans several sites. It is never added to this project's own figure.
No published price band exists for Philippines, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Clark / Central Luzon · All projects in Philippines · All Converge ICT projects · All projects operational · Data center rules in Philippines · Full directory