Narra Technology Park hyperscale campus

Capas / Bamban (New Clark City), Tarlac, Philippines · Clark / Central Luzon market · location approximate to district level
Why it stopped. No financingNo tenantSponsor lacked the means Only a land lease ever existed. No builder, funder, power deal or tenant appeared in over two years, the sponsor had no data center record, and the landlord left it out of its own 2026 announcements. source The graveyard.

Narra Technology Park hyperscale campus was a data center project in Capas / Bamban (New Clark City), Philippines, operated by Endec Group / Narra Technology Park Development Inc. It was cancelled. ArusGrid keeps it on record and excludes it from every total. It was planned for 300 MW of IT load.

Latest change on record: entered the record as cancelled on 11 August 2026. Record last checked against its sources on 11 September 2026.

Open on the mapSuggest a correction
Stage
Cancelled
Planned IT load
300 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Endec Group / Narra Technology Park Development Inc.
Local developer
AI workloads
No signal either way
Evidence grade
None

Where it sits

Narra Technology Park hyperscale campus is the only active project ArusGrid tracks in Clark / Central Luzon, at 12 MW of planned IT load. No third party publishes a colocation vacancy rate for Clark / Central Luzon, and ArusGrid does not estimate one.

It is the only Endec Group project ArusGrid tracks. It sits on the Narra Technology Park. Named funding comes from Endec Group on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Phase 1 at 100 MW is land and permitting with a 2026 target; Phase 2 at 100 MW is announced; Phase 3 at 100 MW is announced. The stage was recorded as cancelled on 11 August 2026. The money on record is US$2.7bn as of June 2024, the announced investment.

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 9 public sources for this project, the latest dated 3 September 2026, and last checked the record on 11 September 2026.

How well evidenced is it

Cancelled projects carry no evidence grade.

AI workloads

StatusNo signal either way

No public signal either way.

Phases

Phase 1 · Land and permitting100 MW, target 2026
Phase 2 · Announced100 MW
Phase 3 · Announced100 MW

Stage history

2026-08-11Cancelled · newsinfo.inquirer.net

Who is behind it

OperatorEndec Group / Narra Technology Park Development Inc. · Local developer
Funder, EquityEndec Group

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2024-06US$2.7bn

The figure covers the whole campus.

Platform deals that include it

Pax Silica, US-PH 4,000-acre AI-native industrial hub (Central Luzon)
Country programme
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No colocation price applies to this product (cancelled).

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. datacenterdynamics.com
  2. pna.gov.ph
  3. philstar.com
  4. w.media
  5. BCDA: No AI, hyperscale data centers to rise in New Clark City (Philippine Daily Inquirer, 2026-08-07)
  6. BCDA: No AI, hyperscale data centers to rise in New Clark City (Philippine Daily Inquirer, 2026-08-11)
  7. P2.5-billion New Clark City tech backbone stalls as bidders vanish (Manila Bulletin, 2026-07-03)
  8. BCDA clarifies misconceptions on Pax Silica project in New Clark City (Philippine Information Agency, 2026-08-10)
  9. Data center boom to yield small gains for Philippines (Philstar, 2026-09-03)

More in Clark / Central Luzon

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.