ArusGrid tracks 4 active data center projects in Qatar with 62 MW of planned IT load, spread over 1 market. Of these, 2 are operational, 1 is operational and expanding and 1 is under construction. Projects under construction or commissioning account for 44 MW. Disclosed running capacity is 18 MW.
Doha is the largest market with 4 projects and 62 MW planned. The operators with the most planned capacity in the country are Meeza (62 MW), Alphabet and Microsoft.
The US export control position for advanced AI chips in Qatar, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.
Data center rules in Qatar, covering approvals, power, incentives, data and water, each dated and sourced.
| Market | Projects | Planned MW | Under construction MW | Operational MW | Colocation vacancy |
|---|---|---|---|---|---|
| Doha | 4 | 62 | 44 | 18 | not published |
Vacancy is the share of built, leasable colocation capacity sitting empty, as published by a third party. It excludes hyperscaler self-build and is never estimated.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Meeza M-VAULT 6, 7 and 8 | Doha | Under construction | 44 | undisclosed | Meeza QSTP LLC | Likely |
| Meeza M-VAULT 1 to 5 (Doha portfolio) | Doha | Expanding | 18 | 18 | Meeza QSTP LLC | Likely |
| Google Cloud Doha Region | Doha | Operational | none published | undisclosed | ||
| Microsoft Azure Qatar Central Region | Doha | Operational | none published | undisclosed | Microsoft |
| Firm | Projects | Roles | Latest award |
|---|---|---|---|
| Elegancia (Estithmar Holding) | 1 | Design and build | 24 September 2026 |
This lists past awards, not bidders on any current project. Inferred links and bids are left out. All firms are on Who builds data centers.