ArusGridProject
Directory › China › Wuhu › Volcano Engine YRD Computing Centre (火山引擎长三角算力中心)

Volcano Engine YRD Computing Centre (火山引擎长三角算力中心) data center

Wuhu, Anhui, China · Wuhu market · location approximate to district level

Volcano Engine YRD Computing Centre (火山引擎长三角算力中心) is a data center project in Wuhu, China, operated by Volcano Engine (火山引擎), via Wuhu Jiangdong Mingyi Technology (芜湖江东名邑科技有限公司). It is under construction. The operator has not published an IT load figure. It is planned for 21,824 racks. ArusGrid does not convert racks into MW.

Latest change on record: moved to under construction in November 2024. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Volcano Engine (火山引擎), via Wuhu Jiangdong Mingyi Technology (芜湖江东名邑科技有限公司)
hyperscaler
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

China, 2026-10-12. China coverage is a pilot of one cluster, Zhongwei in Ningxia, entered on 12 October 2026 from Chinese-language primary and state press sources. Other Chinese hubs are not yet covered, so no China total here describes the country. Many Chinese projects publish rack counts and no megawatts. ArusGrid records the rack count and leaves capacity blank rather than convert it.

Where it sits

Wuhu holds 6 active projects with 298 MW of planned IT load between them, and Volcano Engine YRD Computing Centre (火山引擎长三角算力中心) has no published figure so it sits outside that ranking. Of those, 2 are operational and expanding and 4 are under construction. No third party publishes a colocation vacancy rate for Wuhu, and ArusGrid does not estimate one.

ByteDance has 3 others in China and 1 project elsewhere in the dataset tracked by ArusGrid, including Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1, Volcano Engine GW-scale Park, Hohhot and Volcano Engine GW-scale Computing Center, Ulanqab. It sits on the Wuhu Economic and Technological Development Zone, north of Chizhushan Road (赤铸山路) campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from at the land and permitting stage on 24 May 2024 to under construction in November 2024. The money on record is CN¥8bn as of January 2025, the announced investment. Power comes from Project 220kV substation (phase 1) through a dedicated substation at 220 kV.

The US export control position for advanced AI chips in China, as of 7 October 2026, is recorded as “Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026”. ArusGrid holds 13 public sources for this project, the latest dated 29 July 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

ByteDance cloud unit Volcano Engine builds the site as a computing centre for its AI and cloud services.

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 · Licence required, presumption of denial, case-by-case review for H200-class chips since 15 January 2026 (2026-10-07) source

Phases

21,824 server cabinets and a 220kV substation · Land and permittingSize not published

Stage history

2024-05-24Land and permitting · weda.wuhu.gov.cn
2024-11Under construction · zjw.wuhu.gov.cn

Who is behind it

OperatorVolcano Engine (火山引擎), via Wuhu Jiangdong Mingyi Technology (芜湖江东名邑科技有限公司) · hyperscaler

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2025-01CN¥8bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for China, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Grid and substation works中国能建安徽省电力设计院 (CEEC Anhui Electric Power Design Institute) · Jun 2024 Confirmed source ↗
EPC of the phase 1 220kV substation for the Volcano Engine YRD computing centre.
Land
Land seller芜湖市自然资源和规划局 (parcel 芜开2409) · 132,704 sqm · CNY 63.7m · leasehold · May 2024 Confirmed source ↗
50 year industrial land use right by listing sale, north of Chizhushan Road and east of Taipinghu Road in the Wuhu ETDZ east zone. Contract signed 21 May 2024. Agreed start 19 Dec 2024 and completion 18 Dec 2027. One of two parcels that make up the held 262,436 sqm.
Land seller芜湖市自然资源和规划局 (parcel 芜开2421) · 129,732.15 sqm · CNY 62.27m · leasehold · Oct 2024 Confirmed source ↗
50 year class 1 industrial land use right by listing sale at the same location. Contract signed 13 Nov 2024. Agreed start 30 Apr 2025 and completion 29 Apr 2027. Second of the two parcels in the held total.
Power supply
Dedicated substationProject 220kV substation (phase 1) · 600 MVA · 220kV · Jun 2024 Confirmed source ↗
Four 150MVA split-winding transformers, three 220kV lines and 72 10kV feeders in this phase. Commissioning was planned for Mar 2025. · Applies to the whole campus.

Sources checked 2026-10-22

  1. 芜湖江东名邑科技有限公司火山引擎长三角算力中心项目设计方案批前公示 (芜湖经济技术开发区, 2024-05-24)
  2. 字节火山引擎长三角算力中心环评文件获受理 总投资80亿 (财联社 (新浪财经转载), 2025-01-20)
  3. 芜湖这个产业,目标突破千亿元! (新京报, 2026-07-29)
  4. 字节跳动火山引擎长三角算力中心项目环评公示 (界面新闻) (界面新闻, 2024-05-24)
  5. 芜开2409号宗地成交结果公示 (芜湖市自然资源和规划局, 2024-05-08)
  6. 芜开2421号宗地成交结果公示 (芜湖市自然资源和规划局, 2024-10-30)
  7. 中国能建安徽院中标字节跳动(抖音)火山引擎长三角算力中心220千伏变电站EPC总承包工程 (中国能建 (via 东方财富财富号), 2024-06-03)
  8. 安徽省发展和改革委员会 (安徽省发展和改革委员会, 2024-11-06)
  9. 2025年5月份芜湖市建设工程竣工验收备案一览表 (芜湖市住房和城乡建设局, 2025-06-05)
  10. 2025年7月份芜湖市建设工程竣工验收备案一览表 (芜湖市住房和城乡建设局, 2025-08-07)
  11. 2025年8月份芜湖市建设工程竣工验收备案一览表 (芜湖市住房和城乡建设局, 2025-10-10)
  12. 2025年9月份芜湖市建设工程竣工验收备案一览表 (芜湖市住房和城乡建设局, 2025-10-10)
  13. 2025年10月芜湖市建设工程竣工验收备案一览表 (芜湖市住房和城乡建设局, 2025-11-05)

More in Wuhu

Also run by ByteDance

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.