AREA Group Delapan SBEZ Campus (ADCC)

Bukit Kayu Hitam, Kedah, Malaysia · Penang / North MY market · location approximate to district level

AREA Group Delapan SBEZ Campus (ADCC) is a data center project in Bukit Kayu Hitam, Malaysia, operated by AREA Group. It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to under construction in October 2024. Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
AREA Group
Local developer
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Penang / North MY holds 7 active projects with 432 MW of planned IT load between them, and AREA Group Delapan SBEZ Campus (ADCC) has no published figure so it sits outside that ranking. Of those, 1 is operational, 1 is under construction, 1 is at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Penang / North MY, and ArusGrid does not estimate one.

It is the only AREA Group project ArusGrid tracks. It sits on the Delapan Special Border Economic Zone campus. Named funding comes from AREA Group (real estate PE) on the equity side. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 (30 acres) is under construction with a 2025 target; Phase 2 (126 acres) is announced. The dated record runs from announced only in January 2023 to under construction in October 2024. The money on record is US$15bn as of January 2023, gross development value. Power comes from Tenaga Nasional Berhad through grid supply at 132 kV (reported, unconfirmed).

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 18 October 2024, and last checked the record on 18 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (30 acres) · Under constructionSize not published, target 2025
Phase 2 (126 acres) · AnnouncedSize not published

Stage history

2023-01Announced · datacenterdynamics.com
2024-10Under construction · datacenterdynamics.com

Who is behind it

OperatorAREA Group · Local developer
Funder, EquityAREA Group (real estate PE)

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Gross development value, 2023-01US$15bn

This is the sales value of a property scheme. ArusGrid excludes it from data center spending totals.

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerNorthern Gateway Sdn Bhd · 30 acres · freehold · Oct 2024 Reported source ↗
SPA signed by AREA SPV Data Gateway Sdn Bhd for 30 acres, with an option on another 126 acres for phase 2. Price not disclosed. Northern Gateway is the master developer of Delapan SBEZ. Freehold per DCD 2023-01-06 on the original 150-acre parcel.
Power supply
Grid supplyTenaga Nasional Berhad · 132kV · Oct 2024 Reported source ↗
Site fed from a 132kV substation at Bukit Kayu Hitam about 3km away. TNB is building a second 132kV intake. A 275kV PMU is planned later. · Applies to the whole campus.

Sources checked 2026-10-18

  1. datacenterdynamics.com
  2. areagroup.my
  3. Area Group begins construction of 156-acre Malaysian data center campus (DCD, 2024-10-18)
  4. AREA acquires 30-acre land in Delapan, Kedah to build data centre (EdgeProp Malaysia, 2024-10-11)
  5. Area Group acquires 150 acres for data center park in northern Malaysia (DCD, 2023-01-06)

More in Penang / North MY

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.