ArusGridProject
Directory › Malaysia › Penang / North MY › Open DC PE2

Open DC PE2

Bayan Lepas, Penang, Malaysia · Penang / North MY market · location approximate to district level

Open DC PE2 is a data center project in Bayan Lepas, Malaysia, operated by Open DC (Extreme Broadband). It is operational. The published capacity figure is 30 MW, and its basis is not stated as IT load. The operator reports 30 MW running.

Latest change on record: entered the record as operational in April 2025. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
30 MW
unstated
Running now
30 MW
Operators rarely publish this
Operator
Open DC (Extreme Broadband)
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Penang / North MY holds 7 active projects with 432 MW of planned IT load between them, and Open DC PE2 ranks 6th by planned capacity. Of those, 1 is operational, 1 is under construction, 1 is at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Penang / North MY, and ArusGrid does not estimate one.

Open DC has 1 other in Malaysia tracked by ArusGrid, including Open DC JB1. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as operational in April 2025. Power comes from undisclosed through onsite solar (reported, unconfirmed). Cooling uses hybrid air and liquid cooling.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 23 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2025-04Operational · datacenterdynamics.com

Who is behind it

OperatorOpen DC (Extreme Broadband) · Colocation

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateBayan Lepas Technology Park · 10 acres · Aug 2025 Reported source ↗
10-acre campus; operator of park not named
Power supply
On-site solarundisclosed · Aug 2025 Reported source ↗
incorporates clean energy agreements and solar power, details not disclosed · Applies to the whole campus.
Water and cooling
CoolingHybrid air and liquid cooling Reported source ↗
Expansion halls up to 150 kW per rack with air-cooled and liquid-cooled options

Sources checked 2026-10-22

  1. datacenterdynamics.com
  2. Open DC Plans To Expand Penang, Kedah Data Centre Capacity To Meet Demand (BusinessToday, 2026-09-22)
  3. Open DC lifts Northern Malaysia data centre target to 100MW as PE2 expands (TechWire Asia, 2026-09-23)

More in Penang / North MY

Also run by Open DC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.