Victoria Data Centre Jasin (Melaka AI DC) is a data center project in Jasin, Malaysia, operated by Victoria Data Centre (Hong Kong). It has been announced and has not yet reached the land or permitting stage. It is planned for 96 MW of IT load.
Latest change on record: entered the record as announced on 4 February 2026. Record last checked against its sources on 22 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Penang / North MY holds 7 active projects with 432 MW of planned IT load between them, and Victoria Data Centre Jasin (Melaka AI DC) ranks second by planned capacity. Of those, 1 is operational, 1 is under construction, 1 is at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Penang / North MY, and ArusGrid does not estimate one.
It is the only Victoria Data Centre project ArusGrid tracks. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 4 February 2026. The money on record is RM9,000m (about US$2.1bn) as of February 2026, the announced investment.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 5 February 2026, and last checked the record on 22 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Announced by the Melaka Chief Minister as an AI data centre; 96MW greenfield. Inference from stated AI purpose and scale - no cooling or GPU spec published.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
The figure covers the whole campus.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.