Khazna QAJ1 data center

Ajman, United Arab Emirates · Northern Emirates market · location approximate to city level

Also listed as Khazna data center Ajman and Ajman data centre (Khazna QAJ1).

Khazna QAJ1 is a data center project in Ajman, United Arab Emirates, operated by Khazna Data Centers. It is under construction. It is planned for 100 MW of IT load.

Latest change on record: entered the record as under construction on 24 April 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
100 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Khazna Data Centers
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Strong7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started
Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.

Where it sits

Khazna QAJ1 is the only active project ArusGrid tracks in Northern Emirates, at 100 MW of planned IT load. No third party publishes a colocation vacancy rate for Northern Emirates, and ArusGrid does not estimate one.

Khazna has 6 others in the United Arab Emirates and 1 project elsewhere in the dataset tracked by ArusGrid, including Stargate UAE phase 1, Khazna Dubai Production City and Khazna AUH6 (with AUH8 extension). Named funding comes from G42 on the equity side. The named user of the compute is Microsoft (confirmed).

The stage was recorded as under construction on 24 April 2025. Power comes from Etihad Water and Electricity (EtihadWE) through grid supply. Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 6 public sources for this project, the latest dated 24 February 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

Khazna describes a first 30MW AI deployment phase by Microsoft. Stated AI purpose plus a confirmed hyperscaler tenant on a 100MW greenfield. Liquid cooling stated by w.media on 2025-04-22. Adiabatic free cooling plus liquid cooling for GPU/CPU heat.

Access to AI chips

GradeGovernment-confirmed

A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkYes
A party named in a government authorisationYes
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

G42 · Named in Supplement No. 8 to Part 740, licence-free under A:5 and License Exception STA. Earlier authorised 2025-11-19 for up to 35,000 Nvidia GB300 accelerators. (2026-07-14) Authorisation lapses 2027-04-06 source

Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source

Phases

QAJ1 full facility · Under construction100 MW, target Dec 2026

Stage history

2025-04-24Under construction · khaznadatacenters.com

Who is behind it

OperatorKhazna Data Centers · Colocation
Funder, EquityG42

Who uses the compute

Tenant · hyperscalerMicrosoft · confirmed

Colocation price per kW of IT load per month

No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
ArchitectProarc Architects & Engineering Consultants Reported source ↗
Architect of record, Ajman 100MW data centre
Main contractorLaing O'Rourke · Oct 2024 Reported source ↗
Construction of 100MW, 20-hall Ajman data centre
Power supply
Grid supplyEtihad Water and Electricity (EtihadWE) · Oct 2024 Confirmed source ↗
Release says electricity will be primarily provided by EtihadWE. No capacity or substation stated.
Water and cooling
CoolingHybrid air and liquid cooling Reported source ↗
Adiabatic free cooling plus liquid cooling for GPU/CPU heat

Sources checked 2026-10-21

  1. Khazna Awarded Tier III Certification of Design Documents for Ajman, UAE Facility (Khazna Data Centers, 2026-02-24)
  2. Khazna secures $2.6bn for UAE data centre projects (MEED, 2025-09-03)
  3. G42 capitalizes on Microsoft partnership to add 200 MW of data center capacity through Khazna (Enterprise AM, 2025-11-06)
  4. Construction begins on Khazna data centre in Ajman (MEED, 2024-10-18)
  5. Khazna to boost UAE data center infrastructure with 60 MW projects (Enterprise AM, 2025-04-22)
  6. إنشاء أكبر مركز بيانات محسّن بتكنولوجيا الذكاء الاصطناعي في الإمارات (Al Khaleej, 2024-10-16)

Also run by Khazna

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.