ArusGridProject
Directory › United Arab Emirates › Abu Dhabi › Khazna AUH5 (KEZAD)

Khazna AUH5 (KEZAD) data center

Abu Dhabi, United Arab Emirates · Abu Dhabi market · location approximate to district level

Khazna AUH5 (KEZAD) is a data center project in Abu Dhabi, United Arab Emirates, operated by Khazna Data Centers. It is under construction. It is planned for 30 MW of IT load.

Latest change on record: entered the record as under construction on 1 January 2026. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
30 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Khazna Data Centers
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.

Where it sits

Abu Dhabi holds 7 active projects with 434 MW of planned IT load between them, and Khazna AUH5 (KEZAD) ranks 6th by planned capacity. Of those, 3 are operational and expanding and 4 are under construction. No third party publishes a colocation vacancy rate for Abu Dhabi, and ArusGrid does not estimate one.

Khazna has 6 others in the United Arab Emirates and 1 project elsewhere in the dataset tracked by ArusGrid, including Stargate UAE phase 1, Khazna Dubai Production City and Khazna QAJ1. Named funding comes from G42 on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as under construction on 1 January 2026.

The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 1 public source for this project, the latest dated 1 January 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Part of Khazna's stated AI capacity programme. No cooling or density disclosure for this site.

Access to AI chips

GradeGovernment-confirmed

A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkYes
A party named in a government authorisationYes
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

G42 · Named in Supplement No. 8 to Part 740, licence-free under A:5 and License Exception STA. Earlier authorised 2025-11-19 for up to 35,000 Nvidia GB300 accelerators. (2026-07-14) Authorisation lapses 2027-04-06 source

Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source

Stage history

2026-01-01Under construction · meed.com

Who is behind it

OperatorKhazna Data Centers · Colocation
Funder, EquityG42

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. Construction begins on Khazna data centre (MEED, 2026-01-01)

More in Abu Dhabi

Also run by Khazna

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.