Pure DC AUH01 (Yas Island)

Yas Island, Abu Dhabi, United Arab Emirates · Abu Dhabi market · location approximate to district level

Pure DC AUH01 (Yas Island) is a data center project in Yas Island, United Arab Emirates, operated by Pure Data Centres Group. It is operational and expanding. It is planned for 48 MW of IT load. The operator reports 20 MW running.

Latest change on record: moved to expanding on 27 April 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
48 MW
Running now
20 MW
Operators rarely publish this
Operator
Pure Data Centres Group
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.

Where it sits

Abu Dhabi holds 7 active projects with 434 MW of planned IT load between them, and Pure DC AUH01 (Yas Island) ranks third by planned capacity. Of those, 3 are operational and expanding and 4 are under construction. No third party publishes a colocation vacancy rate for Abu Dhabi, and ArusGrid does not estimate one.

It is the only Pure DC project ArusGrid tracks. Named funding comes from Oaktree Capital Management on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. Building 1 at 20 MW is operational; Building 2 (fully permitted) at 28 MW is land and permitting. The dated record runs from operational on 27 February 2025 to operational and expanding on 27 April 2026. Power comes from TAQA through grid supply. Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 8 public sources for this project, the latest dated 27 May 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Building 1 was handed to an unnamed hyperscale customer. Hyperscale tenancy on a modern greenfield.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkYes
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source

Phases

Building 1 · Operational20 MW
Building 2 (fully permitted) · Land and permitting28 MW

Stage history

2025-02-27Operational · puredc.com
2026-04-27Expanding · puredc.com

Who is behind it

OperatorPure Data Centres Group · Colocation
Funder, EquityOaktree Capital Management

Who uses the compute

Tenant · hyperscalerUndisclosed hyperscaler · confirmed

41 MW · Whole campus; first hall handed over 2025, expansion from 41MW to 48MW announced Apr 2026 · as of 2026-07-15

Upgrade from reported to confirmed on the operator's own words. Pure DC's 2025 review states 'transitioning our Abu Dhabi campus into operations for our hyperscale customer'. DCD adds that the first data hall was handed over to a hyperscale customer in 2025 and the campus grows from 41MW to 48MW. Identity still undisclosed.

Source · A year of international expansion, growth and innovation: Pure DC's 2025 in review (Pure Data Centres Group, 2026-07-15)

Source · Pure DC to expand Abu Dhabi data center campus by 7MW (DCD, 2026-04-24)

Colocation price per kW of IT load per month

No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractorLaing O'Rourke · Mar 2025 Confirmed source ↗
Construction of the Yas Island campus. First data hall handed over on 2025-02-27.
Power supply
Grid supplyTAQA · Apr 2026 Confirmed source ↗
TAQA gave final approvals to raise campus IT capacity from 41MW to 48MW through design optimisation and new power strings. · Applies to the whole campus.
Power allocation or planMohammed bin Rashid Al Maktoum Solar Park (certificates) · Apr 2026 Confirmed source ↗
100% of 2025 electricity use matched with I-RECs from the MBR Solar Park. Certificate matching. No physical supply from the park. · Applies to the whole campus.
Water and cooling
CoolingHybrid air and liquid cooling Confirmed source ↗
Hybrid air and liquid cooling on a 16-acre site.

Sources checked 2026-10-22

  1. Pure DC commits to Middle East focus, backed by in-region solar renewables (Pure Data Centres Group, 2026-04-27)
  2. Pure DC not pausing Middle East investment, contrary to reports, despite drone debris near miss (DatacenterDynamics, 2026-05-01)
  3. London data centre firm Pure DC secures $2.7BN for European and Middle East expansion (Tech.eu, 2026-05-27)
  4. Abu Dhabi (Yas Island) (Pure DC)
  5. Laing O'Rourke achieves major milestone for Pure Data Centres in Abu Dhabi (Pure Data Centres Group, 2025-03-14)
  6. Pure DC doubles down on capacity building and decarbonization efforts in the Middle East (W.Media, 2026-04-27)
  7. Laing O'Rourke achieves major milestone for Pure Data Centres in Abu Dhabi (Intelligent Data Centres, 2025-05-09)
  8. JLL secures FM contract with Pure DC in Abu Dhabi (FMJ, 2025-03-10)

More in Abu Dhabi

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.