Khazna AUH6 (with AUH8 extension) is a data center project in Masdar City, United Arab Emirates, operated by Khazna Data Centers. It is operational and expanding. It is planned for 32 MW of IT load. The operator reports 32 MW running.
Latest change on record: moved to expanding on 24 April 2025. Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.
Abu Dhabi holds 7 active projects with 434 MW of planned IT load between them, and Khazna AUH6 (with AUH8 extension) ranks 4th by planned capacity. Of those, 3 are operational and expanding and 4 are under construction. No third party publishes a colocation vacancy rate for Abu Dhabi, and ArusGrid does not estimate one.
Khazna has 6 others in the United Arab Emirates and 1 project elsewhere in the dataset tracked by ArusGrid, including Stargate UAE phase 1, Khazna Dubai Production City and Khazna QAJ1. Named funding comes from G42 on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The dated record runs from operational on 1 February 2024 to operational and expanding on 24 April 2025. Power comes from Emerge through onsite solar (reported, unconfirmed).
The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 5 public sources for this project, the latest dated 3 September 2025, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Marketed by the operator as a hyperscale AI-ready facility at launch.
A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.
G42 · Named in Supplement No. 8 to Part 740, licence-free under A:5 and License Exception STA. Earlier authorised 2025-11-19 for up to 35,000 Nvidia GB300 accelerators. (2026-07-14) Authorisation lapses 2027-04-06 source
Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Abu Dhabi · All projects in United Arab Emirates · All Khazna projects · All projects operational and expanding · Data center rules in United Arab Emirates · Full directory
Project team on other projects: Laing O'Rourke