Khazna Dubai Production City is a data center project in Dubai Production City, United Arab Emirates, operated by Khazna Data Centers. It has been announced and has not yet reached the land or permitting stage. It is planned for about 100 MW of IT load, a figure ArusGrid derived from a published total.
Latest change on record: entered the record as announced on 3 September 2025. Record last checked against its sources on 22 October 2026.
Next gate to watch: Land secured.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.
Dubai holds 6 active projects with 129 MW of planned IT load between them, and Khazna Dubai Production City ranks first by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 1 is under construction and 3 are announced only. No third party publishes a colocation vacancy rate for Dubai, and ArusGrid does not estimate one.
Khazna has 6 others in the United Arab Emirates and 1 project elsewhere in the dataset tracked by ArusGrid, including Stargate UAE phase 1, Khazna QAJ1 and Khazna AUH6 (with AUH8 extension). Named funding comes from G42 on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as announced only on 3 September 2025.
The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 2 public sources for this project, the latest dated 3 September 2025, and last checked the record on 22 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
No public signal either way.
A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.
G42 · Named in Supplement No. 8 to Part 740, licence-free under A:5 and License Exception STA. Earlier authorised 2025-11-19 for up to 35,000 Nvidia GB300 accelerators. (2026-07-14) Authorisation lapses 2027-04-06 source
Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Dubai · All projects in United Arab Emirates · All Khazna projects · All projects announced only · Data center rules in United Arab Emirates · Full directory