Moro Hub Green Data Centre (MBR Solar Park)

Saih Al-Dahal, Dubai, United Arab Emirates · Dubai market · location approximate to district level

Moro Hub Green Data Centre (MBR Solar Park) is a data center project in Saih Al-Dahal, United Arab Emirates, operated by Moro Hub. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as operational on 16 February 2023. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Moro Hub
Local developer
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.

Where it sits

Dubai holds 6 active projects with 129 MW of planned IT load between them, and Moro Hub Green Data Centre (MBR Solar Park) has no published figure so it sits outside that ranking. Of those, 1 is operational, 1 is operational and expanding, 1 is under construction and 3 are announced only. No third party publishes a colocation vacancy rate for Dubai, and ArusGrid does not estimate one.

Moro Hub has 1 other in the United Arab Emirates tracked by ArusGrid, including Moro Hub Green Data Centre (Warsan). Named funding comes from DEWA on the equity side. The named user of the compute is Emirates Group (confirmed).

The stage was recorded as operational on 16 February 2023.

The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 2 public sources for this project, the latest dated 28 January 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

Enterprise and government colocation with a sustainability positioning. No AI tenant, workload or cooling disclosure.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkYes
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source

Stage history

2023-02-16Operational · dewa.gov.ae

Who is behind it

OperatorMoro Hub · Local developer
Funder, EquityDEWA

Who uses the compute

Tenant · enterpriseEmirates Group · confirmed

Colocation of the Emirates Group data centre, relocation from mid-2026 · as of 2025-03-26

The tenant's own release says Emirates Group co-locates to Moro Hub at the Mohammed Bin Rashid Al Maktoum Solar Park, with rack space, power, cooling and equipment supply, relocating from mid-2026. The Solar Park site is ArusGrid facility.

Source · Emirates Group co-locates to world's largest solar-powered data centre (Emirates, 2025-03-26)

Source · Emirates to relocate data center to world's largest solar-powered data center hub (DCD, 2025-03-28)

Colocation price per kW of IT load per month

No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-19

  1. Maktoum bin Mohammed inaugurates second phase of Moro Hub's solar-powered data centre (DEWA, 2025-01-23)
  2. DEWA approves second phase of solar-powered green data centre in Dubai (Power Line, 2026-01-28)

More in Dubai

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.