Moro Hub Green Data Centre (Warsan) is a data center project in Warsan, United Arab Emirates, operated by Moro Hub. It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as under construction on 23 January 2026. Record last checked against its sources on 22 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.
Dubai holds 6 active projects with 129 MW of planned IT load between them, and Moro Hub Green Data Centre (Warsan) has no published figure so it sits outside that ranking. Of those, 1 is operational, 1 is operational and expanding, 1 is under construction and 3 are announced only. No third party publishes a colocation vacancy rate for Dubai, and ArusGrid does not estimate one.
Moro Hub has 1 other in the United Arab Emirates tracked by ArusGrid, including Moro Hub Green Data Centre (MBR Solar Park). Named funding comes from DEWA on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as under construction on 23 January 2026. Power comes from DEWA.
The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 2 public sources for this project, the latest dated 23 January 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
No AI tenant, workload or cooling disclosure.
Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.
Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Dubai · All projects in United Arab Emirates · All Moro Hub projects · All projects under construction · Data center rules in United Arab Emirates · Full directory